BNAE RG.AERO 000 76-B PDF

BNAE RG.AERO 000 76-B PDF

Name:
BNAE RG.AERO 000 76-B PDF

Published Date:
09/01/2023

Status:
[ Active ]

Description:

PROGRAMME MANAGEMENT Recommendations for the implementation of the integrated logistic support

Publisher:
Bureau de Normalisation de l'Aéronautique et de l'Espace

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$75.9
Need Help?
BILINGUAL

Purpose and scope of the recommendation

The purpose of the RG.Aero 000 76 recommendation is to:

— identify and describe, in a structured way, the principles of the integrated logistic support (ILS) activities and tasks for the main types of stakeholders in the system life cycle, from the expression of need to disposal;

— place the activities, tasks and ILS deliverables within the programme execution;

— identify the main selection and sizing of activities and tasks criteria according to the nature and the requirements of the programme;

— control the relations with the other aspects of programme management.

This recommendation covers the following subjects:

— management of ILS (definition, implementation and running of the processes);

— expression of the support requirements;

— elaboration of the contracts (for development, maintenance, supply, etc.);

— implementation of the tasks and processes.

This recommendation is also related to the following subjects:

— relations with costs and lead times control, configuration management, performance and RAMS management, quality assurance, documentation management;

— regulations (information system security, export controls, safety at work, etc.);

— human and organisational factors (HOF);

— environment (RoHS, REACh, etc.);

— information systems (IS) and the links between them;

— logistics information systems (LIS);

— in-service support (ISS) activities;

— configuration management of ILS objects;

— life cycle.

The following stakeholders are concerned by ILS:

— users in the broadest sense: operators, maintenance operators, administrators, dismantlers of the system, trainers;

— the customer, who:

o prepares technical and contractual specifications of need with which the system shall comply,

o sets up the funding of the programme,

o oversees the realization and commissioning of the main system and of the support system,

o facilitates the feedback;

NOTE 1 At the highest level of the system, the customer can also be referred to as the “project owner”.

NOTE 2 The “main system” can also be referred to as the "system of interest".

— the supplier(s) who deliver a system (main and support) to the customer, which meets the performance specifications, including the regulatory requirements, on time and for the agreed cost, throughout the system life cycle;

NOTE At the highest level of the system, the supplier can also be referred to as the “industrial prime contractor”.

— the regulatory authorities that supervise and approve the support processes and equipment, as needed.

The principles laid down in this recommendation can be applied, after adaptation, to all the customer/supplier relations resulting from the breakdown of the main contract into sub-contracts.


Edition : B
File Size : 1 file , 920 KB
Number of Pages : 84
Published : 09/01/2023

History

BNAE RG.AERO 000 76-B
Published Date: 09/01/2023
PROGRAMME MANAGEMENT Recommendations for the implementation of the integrated logistic support
$75.9
BNAE RG.AERO 000 76-A
Published Date: 12/01/2012
Programme management - Recommendations for the implementation of the Intregrated Logistic Support
$81

Related products

BNAE RM.AERO 802 02
Published Date: 11/01/1997
ESTIMATION DES INCERTITUDES SUR LES MESURES DE PRESSION
$28.5
BNAE RG.AERO 000 44
Published Date: 02/01/2014
Management de programme Guide d’application de l’ARP4754A / ED-79A
$81
BNAE RM.AERO 801 01-A
Published Date: 11/01/1976
MESURAGE DES TEMPERATURES--INSTRUCTIONS GENERALES
$33.9

Best-Selling Products

CMAA 70-04
Published Date: 01/01/2004
Specifications for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
CMAA 70-2010
Published Date: 2010
Specification for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
CMAA 70-2020
Published Date: 2020
Specification for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
$31.5
CMAA 74-2004
Published Date:
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
CMAA 74-2010
Published Date: 2010
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
CMAA 74-2020
Published Date: 2020
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
$31.5