Guide to Developing a Standard Operating Procedure Manual PDF

Guide to Developing a Standard Operating Procedure Manual PDF

Name:
Guide to Developing a Standard Operating Procedure Manual PDF

Published Date:
2009

Status:
Active

Description:

Publisher:
Building Owners and Managers Association International

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
guide-to-developing-a-standard-operating-procedure-manual_1876552

Choose Document Language:
19.80 €
Need Help?
BOMA's Guide to Developing a Standard Operating Procedure Manual provides a straightforward, organized process for property professionals looking to create or update an indispensable SOP Manual for their building or company.

The SOP Guidebook provides the reader with:
  • Information on what an SOP Manual is, why it's important, and how it's used.
  • Steps for creating an SOP Manual - from planning to assembling your editiorial team to distribution and updates.
  • Detailed outlines of 18 SOP sections, including Tenant Emergency Plan, Lease Administration, Accounting and Reporting, Business Plans and Re-Forecasts, Contracts/Contract Services, Management Office Operations, Physical Operations, Safety and OSHA Compliance, Fire and Life Safety Systems, Security, and more.
  • Business tips from the author, and a comprehensive listing of additional resources.
  • Easy to follow outline format.
  • Everything needed to create an SOP Manual for your building or company or update your existing manual.
The Guide to Developing a Standard Operating Procedure Manual is authored by P. Marc Fischer, MBA, CPM®, RPA, CCIM, BOMA Fellow.
File Size : 1 file , 4.5 MB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 91
Product Code(s) : SOPMANUALE, SOPMANUALP, SOPMANUALB
Published : 2009

History


Related products


Best-Selling Products

CAN/CSA-IEC 31010:20
Published Date: 04/01/2020
Risk management - Risk assessment techniques (Adopted IEC 31010:2019, second edition, 2019-06)
70.50 €
CAN/CSA-IEC 61000-4-15:12 (R2021)
Published Date: 06/01/2012
CAN/CSA-IEC 61000-4-15:12 - Electromagnetic compatibility (EMC) - Part 4-15: Testing and measurement techniques - Flickermeter - Functional and design specifications (Adopted IEC 61000-4-15:2010, edition 2.0, 2010-08)
69.30 €
CAN/CSA-IEC 61000-4-18:14 (R2023)
Published Date: 10/01/2014
Electromagnetic compatibility (EMC) - Part 4-18: Testing and measurement techniques - Damped oscillatory wave immunity test (Adopted IEC 61000-4-18:2011, edition 1:2006 consolidated with amendment 1:2010)
78.00 €
CAN/CSA-IEC 61000-4-2:12 (R2022)
Published Date: 06/30/2012
Electromagnetic Compatibility (EMC) - Part 4-2: Testing and Measurement Techniques - Electrostatic Discharge Immunity Test (Adopted CEI/IEC 61000-4-2:1995 + A1:1998, edition 1.1, 1999-05)
84.90 €
CAN/CSA-IEC 61000-4-3:21
Published Date: 05/01/2021
Electromagnetic compatibility (EMC) - Part 4-3: Testing and measurement techniques - Radiated, radio-frequency, electromagnetic field immunity test (IEC 61000-4-3:2006+A1:2007+A2:2010, IDT)
184.80 €
CAN/CSA-IEC 61000-4-30:16
Published Date: 08/05/2022
Amendment 1 to Electromagnetic compatibility (EMC) - Part 4-30: Testing and measurement techniques - Power quality measurement methods (Adopted IEC 61000-4-30:2015, third edition, 2015-02)
3.30 €