BRE IP19/11 PDF

BRE IP19/11 PDF

Name:
BRE IP19/11 PDF

Published Date:
11/01/2011

Status:
[ Active ]

Description:

ASSESSING THE SUSTAINABILITY OF OFFICE REFURBISHMENT WITH BREEAM A case study

Publisher:
Building Research Establishment Limited

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
bre-ip19-11_2744128

Choose Document Language:
7.50 €
Need Help?
ELECTRONIC ONLY

INTRODUCTION

The Building Centre was established in 1931. It has developed to become an independent forum dedicated to providing information to all sectors of the built environment and operates as the commercial arm of the Building Centre Trust. The Building Centre is also landlord to a number of organisations associated with the construction industry including UK-GBC and CPA. In late 2009, the decision was taken to refurbish the first floor of the building for these two tenants. For both, it was essential that the refurbishment was carried out in a demonstrably sustainable way while also providing a bright and healthy workplace for staff. BREEAM is recognised as the UK industry standard for benchmarking sustainability and so both landlord and tenants agreed to set the contractor, Morgan Lovell, a target BREEAM rating of Excellent for the project. From the outset, all parties were prepared to accept that there might be some additional outlay, but the objective was to deliver the project for about the same cost as a typical central London refurbishment project. Although a higher rating of Outstanding is available, the constraints of the project were such that Excellent was considered to be a stretching but realistic target.


Edition : 11
File Size : 1 file , 1.2 MB
Number of Pages : 12
Published : 11/01/2011

History


Related products

BRE IP14/14
Published Date: 11/01/2014
Natural Fibre Reinforced Polymers (NFRPs) in the construction industry
6.90 €
BRE DG494
Published Date: 07/19/2005
Using UK grown Douglas fir and larch timber for external cladding
5.40 €
BRE EP77
Published Date: 12/07/2007
Achieving durable repaired concrete structures Adopting a performance-based intervention strategy
31.80 €
BRE IP12/12
Published Date: 06/01/2012
SMART GROWTH A sustainable strategy for urban development and regeneration
7.50 €

Best-Selling Products

CAN/CSA-IEC/TS 61000-3-5:12 (R2021)
Published Date: 06/01/2012
Electromagnetic compatibility (EMC) - Part 3-5: Limits - Limitation of voltage fluctuations and flicker in low-voltage power supply systems for equipment with rated current greater than 75 A (Adopted IEC/TS 61000-3-5:2009, edition 2.0, 2009-07)
14.10 €
CAN/CSA-IEC/TS 62600-4:22
Published Date: 10/18/2022
Marine energy -- Wave, tidal and other water current converters -- Part 4: Specification for establishing qualification of new technology
46.80 €