BS 12/30263295 DC PDF

BS 12/30263295 DC PDF

Name:
BS 12/30263295 DC PDF

Published Date:
05/11/2012

Status:
Active

Description:

BS 8524-1. Active fire curtain barrier. Assemblies. Part 1. Specification

Publisher:
BSI Group

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?


Cross References:
BS 476-6
BS 476-7
BS 476-20:1987
BS 476-22
BS 476-31 .1
BS 5234-2
BS 5839
BS 8524-2
BS EN 54
BS EN 1363-1
BS EN 1363-2
BS EN 1366-7
BS EN 12453:2001
BS EN 12605
BS EN 13501-1
BS EN 13501-2
BS EN 13823
BS EN 14600
BS EN 1634-1:2008
BS EN 1634-3:2004
BS EN ISO 1182
BS EN ISO 1716
BS EN ISO 13943
DD CLC/TS 61496-2
PD 7974
BS 8214
BS 9991
BS 9999
BS EN 1364
BS EN 12101-1
BS EN 12101-10
BS ISO 21927
BS EN ISO 11925-2
PAS 121
BS 8300


All current amendments available at time of purchase are included with the purchase of this document.
Number of Pages : 44
Published : 05/11/2012

History

BS 12/30263295 DC
Published Date: 05/11/2012
BS 8524-1. Active fire curtain barrier. Assemblies. Part 1. Specification
BS 09/30189801 DC
Published Date: 05/29/2009
BS 8524-1. Active fire curtain barrier assemblies. Part 1. Specification

Related products

BS EN 12453:2017+A1:2021
Published Date: 05/02/2023
Industrial, commercial and garage doors and gates. Safety in use of power operated doors. Requirements and test methods
$119.634
BS EN 1634-3:2004
Published Date: 04/30/2007
Fire resistance and smoke control tests for door and shutter assemblies, openable windows and elements of building hardware-Smoke control test for door and shutter assemblies
$57.15

Best-Selling Products

CS UK CAS01
Published Date: 01/01/2003
The provision of holes in reinforced concrete beams
$7.5
CS UK CAS02
Published Date: 01/01/2014
Suspended concrete floors: maximum size of pour allowable and location of construction joints
$6
CS UK CAS03
Published Date: 02/01/2014
Straightening and rebending reinforcement on site
$6
CS UK CAS04
Published Date: 01/01/2014
Congested reinforcement: effects on placing and compacting concrete
$6
CS UK CAS05
Published Date: 04/01/2014
Holding down bolts in concrete: Suggested design procedures to BS 8110-1
$7.5
CS UK CAS06
Published Date: 01/01/2003
Reinforcement ripple
$7.5