BS EN 60371-3-5:2006 PDF

BS EN 60371-3-5:2006 PDF

Name:
BS EN 60371-3-5:2006 PDF

Published Date:
12/29/2006

Status:
Active

Description:

Insulating materials based on mica-Specifications for individual materials-Glass-backed mica paper with an epoxy resin binder for post-impregnation (VPI)

Publisher:
British-Adopted European Standard

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$48.006
Need Help?


Cross References:
IEC 60371-2:2004
IEC 60371-3-2
ISO 5636-5:2003
EN 60371-2:2004
EN 60371-3-2:2006

File Size : 1 file , 620 KB
ISBN(s) : 0580479684
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 14
Product Code(s) : 30160648, 30160648, 30160648
Published : 12/29/2006

History

BS EN 60371-3-5:2006
Published Date: 12/29/2006
Insulating materials based on mica-Specifications for individual materials-Glass-backed mica paper with an epoxy resin binder for post-impregnation (VPI)
$48.006

Related products

BS EN 60371-2:2004
Published Date: 12/10/2004
Specification for insulating materials based on mica-Methods of test
$79.248
BS EN 60371-3-2:2006
Published Date: 12/29/2006
Insulating materials based on mica-Specifications for individual materials-Mica paper
$57.15
BS EN 1034-1:2021
Published Date: 05/28/2021
Safety of machinery. Safety requirements for the design and construction of paper making and finishing machines-Common requirements
$110.49

Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$0.3
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$123.9
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
$62.1