BS EN 60889:1997 PDF

BS EN 60889:1997 PDF

Name:
BS EN 60889:1997 PDF

Published Date:
05/15/1997

Status:
Active

Description:

Hard drawn aluminium wire for overhead line conductors

Publisher:
British-Adopted European Standard

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$48.006
Need Help?
This standard is applicable to hard-drawn wires for the manufacture of stranded conductors for overhead power transmission purposes. It specifies the mechanical and electrical properties of wires in the diameter range 1.25 mm to 5.00 mm.

Cross References:
BS 5714
BS EN 10002-1
ISO 7802

File Size : 1 file , 310 KB
ISBN(s) : 0580274217
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 12
Product Code(s) : 1027075, 1027075, 01027075
Published : 05/15/1997

History

BS EN IEC 62641:2022
Published Date: 06/20/2022
Conductors for overhead lines. Aluminium and aluminium alloy wires for concentric lay stranded conductors
$57.15
BS EN 60889:1997
Published Date: 05/15/1997
Hard drawn aluminium wire for overhead line conductors
$48.006
BS 3242:1970
Published Date: 03/31/1970
Specification for aluminium alloy stranded conductors for overhead power transmission
$48.006

Related products

BS EN IEC 60317-18:2020
Published Date: 08/06/2020
Specifications for particular types of winding wires-Polyvinyl acetal enamelled rectangular copper wire, class 120
$57.15

Best-Selling Products

AI/ASPHALT AI MS-16
Published Date: 03/01/1983
ASPHALT IN PAVEMENT PRESERVATION & MAINTENANCE
AI/ASPHALT AI MS-17
Published Date: 01/01/1969
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 06/01/1983
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-17
Published Date: 01/01/2000
ASPHALT OVERLAYS FOR HIGHWAY AND STREET REHABILITATION
AI/ASPHALT AI MS-1
Published Date: 01/01/2008
THICKNESS DESIGN ASPHALT PAVEMENTS FOR HIGHWAYS & STREETS
$19.5
AI/ASPHALT AI MS-22
Published Date: 01/01/1983
CONSTRUCTION OF HOT MIX ASPHALT PAVEMENTS
$8.7