Railway Applications. Fixed installations and rolling stock. Technical criteria for the coordination between electric traction power supply systems and rolling stock to achieve interoperability-General
Document status: Active
Space product assurance. Wire-wrapping of high reliability electrical connections
Document status: Active
Electrical test methods for low voltage energy cables
Document status: Active
Electrical test methods for low voltage energy cables
Document status: Active
Non electrical test methods for low voltage energy cables
Document status: Active
Non electrical test methods for low voltage electric cables
Document status: Active
Covered conductors for overhead lines and the related accessories for rated voltages above 1 kV AC and not exceeding 36 kV AC-Covered conductors
Document status: Active
Covered conductors for overhead lines and the related accessories for rated voltages above 1 kV a.c. and not exceeding 36 kV a.c.-Guide to use
Document status: Active
Alarm systems. Combined and integrated alarm systems-General requirements
Document status: Active
Common test methods for cables under fire conditions. Heat release and smoke production measurement on cables during flame spread test. Test apparatus, procedures, results
Document status: Active