Electrical Coordination, Includes Update No. 1 (1998) and Update No. 2 (2002)
Document status: Active
Principles and Practices of Electrical Coordination Between Pipelines and Electric Supply Lines
Document status: Active
Principles and Practices of Electrical Coordination Between Pipelines and Electric Supply Lines
Document status: Active
Design criteria of overhead transmission lines
Document status: Active
Design criteria of overhead transmission lines (Adopted CEI/IEC 60826:2003, third edition, 2003-10, with Canadian deviations) | Criteres de conception des lignes aeriennes de transport (norme CEI/IEC 60826:2003 adoptee, troisieme edition, 2003-10, avec exigences propres au Canada)
Document status: Active
Power installations exceeding 1 kV a.c. -Part 1:Common rules
Document status: Active
Railway Electrification Guidelines
Document status: [ Withdrawn ]
Low-Profile, Single-Phase, Dead-Front, Pad-Mounted Distribution Transformers
Document status: Active
Gapless Metal Oxide Surge Arresters for Alternating Current Systems
Document status: Active