CEI 17-129 PDF

CEI 17-129 PDF

Name:
CEI 17-129 PDF

Published Date:
08/01/2014

Status:
[ Active ]

Description:

High-voltage switchgear and controlgear Part 302: Alternating current circuit-breakers with intentionally nonsimultaneous pole operation

Publisher:
Comitato Elettrotecnico Italiano

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$68.7
Need Help?
BILINGUAL

This part of IEC 62271 provides guidance on the design, construction, specification and testing of circuit-breakers with intentional non-simultaneous pole operation which are excluded from the scope of IEC 62271-100. In all other respects the scope of this technical report is identical to that of IEC 62271-100. This technical report provides supplementary information and guidance for this type of circuit-breaker and is intended to be used in conjunction with IEC 62271-100.

Intentional non-simultaneous pole operation may be implemented by mechanical or electrical means and both methods are within the scope of this technical report. Where the implementation is by purely electrical means, for example for independent pole operated circuit-breakers, adequate precautions should be taken in the application to prevent operation outside the proven capability of the circuit-breaker.

Circuit-breakers with intentional non-simultaneous pole operation are mainly used for the implementation of controlled switching, and this technical report primarily addresses the requirements of circuit-breakers for such applications. More detailed information regarding the use of controlled switching can be found in CIGRE Technical Brochures 262 [1](1), 263 [2] and 264 [3]. Requirements for associated protection and/or control facilities are not covered unless these form an integral part of the circuit-breaker.

This technical report considers two basic system configurations for achieving nonsimultaneous operation:

- a circuit-breaker intended for non-simultaneous operation which is supplied and tested independent from any particular controller;

-a circuit-breaker intended for non-simultaneous operation with a dedicated controller (which may be integrated into the circuit-breaker) and necessary sensors and auxiliary equipment which form part of the tested equipment.

The basic requirements in each case are identical, however the interpretation of the test results depends upon whether the intended controller is included in the test programme. Further details on this aspect are incorporated into Clause 6 of this technical report.

For the purposes of this technical report, it has been assumed that there is no significant interaction between the effects of the various parameters (for example ambient temperature, control voltage etc) which are considered to affect the mechanical performance of the circuitbreaker. This has not been proven for all combinations however service experience with controlled switching suggests this assumption is valid in practice for most commonly used drive technologies. Annex F provides some examples in support of this assumption.

(1) Figures in square brackets refer to the bibliography.


Edition : 14
File Size : 1 file , 1.4 MB
Number of Pages : 122
Published : 08/01/2014

History


Related products

CEI EN 60512-11-12
Published Date: 11/01/2003
Connectors for electronic equipment - Tests and measurements - Part 11-12: Climatic tests - Test 11m: Damp heat, cyclic
$5.1
CEI EN IEC 61300-2-22
Published Date: 09/01/2024
Fibre optic interconnecting devices and passive components - Basic test and measurement procedures - Part 2-22: Tests - Change of temperature
$12.3
CEI EN 50382-1
Published Date: 01/01/2009
Railway applications - Railway rolling stock high temperature power cables having special fire performance Part 1: General requirements
$23.7
CEI EN 61158-4-11
Published Date: 02/01/2016
Industrial communication networks - Fieldbus specifications Part 4-11: Data-link layer protocol specification - Type 11 elements
$66.6

Best-Selling Products

JOTP JOTP-001
Published Date: 01/08/2013
Allied Ammunition Safety and Suitability for Service Assessment Testing Publication - Guidance
$7.2
JOTP JOTP-010
Published Date: 01/08/2013
Safety and Suitability for Service Assessment Testing for Shoulder Launched Munitions
$18
JOTP JOTP-010A
Published Date: 11/07/2014
Safety and Suitability for Service Assessment Testing for Shoulder Launched Munitions
$18
JOTP JOTP-010B
Published Date: 05/09/2016
Safety and Suitability for Service Assessment Testing for Shoulder Launched Munitions
$18
JOTP JOTP-011
Published Date: 12/05/2014
Safety and Suitability for Service Assessment Testing for Surface and Underwater Launched Munitions
$18
JOTP JOTP-012
Published Date: 07/01/2013
Safety and Suitability for Service Assessment Testing for Aircraft Launched Munitions
$18