CEI 50341-2-19 PDF

CEI 50341-2-19 PDF

Name:
CEI 50341-2-19 PDF

Published Date:
09/01/2015

Status:
[ Active ]

Description:

Overhead electrical lines exceeding AC 1 kV Part 2-19: National Normative Aspects (NNA) for CZECH REPUBLIC (based on EN 50341-1:2012)

Publisher:
Comitato Elettrotecnico Italiano

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$28.5
Need Help?
BILINGUAL

CZ.1 New overhead line

The new overhead line is considered a brand new electric overhead line with nominal voltage exceeding 1 kV AC, between the points A and B.

The new branch line of the existing overhead line shall be considered a new overhead line except for a junction support for which the specific requirements shall be defined in the Project Specification.

The extent of application of this standard in respect of reconstruction, relaying and extension of existing overhead lines shall be determined in the Project Specification. Simultaneously, the Project Specification shall determine, which of the previous national standards shall be used and to what extent they shall be used for the project in question.

Field of application 

CZ.1 Field of application

The requirements of this standard shall be adopted, where applicable (e.g. requirements on loads, external clearances, etc.), for telecommunication cables as well.

In case of overhead line under the design stage, parties concerned shall agree the extent of the application of this standard.

Overhead line under construction may be completed according to standards valid during the design stage of the line. The parties concerned shall agree any possible application of certain clauses of this standard.

CZ.2 Installation of telecommunication equipment on supports

Provisions of this standard also apply to the telecommunication equipment and devices (aerials, dish antennas, etc.) which are installed on individual supports of overhead power lines, especially in terms of wind and ice loads on such installed equipment. Design and installation has to respect requirements of the utility operating the line in question. The design of such telecommunication equipment has to incorporate such technical solutions and such precautions, which shall allow safe access and maintenance of both a power line and telecommunication equipment, and which shall provide protection of persons performing repairs or maintenance of the power line and/or telecommunication equipment against electric shock and protection of telecommunication equipment and attached installations against the influence of the power line (short-circuits, switching and lightning overvoltages etc.).


Edition : 15
File Size : 1 file , 4.5 MB
Number of Pages : 66
Published : 09/01/2015

History


Related products

CEI EN IEC 62541-12
Published Date: 03/01/2021
OPC unified architecture Part 12: Discovery and global services
$62.7
CEI UNI ISO/IEC 27001
Published Date: 03/01/2014
Information technology -Security techniques - Information security management systems - Requirements
$17.7
CEI UNI ISO 80000-12
Published Date: 04/01/2010
Quantities and units Part 12: Solid state physics
$19.2

Best-Selling Products

VDI/VDE/ATV 3552 - DRAFT
Published Date: 10/01/2006
Draft Document - Use of field bus systems in water supply plants