CEI CLC/TS 50152-4 PDF

CEI CLC/TS 50152-4 PDF

Name:
CEI CLC/TS 50152-4 PDF

Published Date:
03/01/2022

Status:
[ Active ]

Description:

Railway applications - Fixed installations - Particular requirements for AC switchgear Part 4: AC metal-enclosed traction switchgear

Publisher:
Comitato Elettrotecnico Italiano

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$25.5
Need Help?
ENGLISH

This document specifies requirements for prefabricated metal-enclosed traction switchgear for alternating current with traction voltages and frequencies as specified in EN 50163:2004 and used in indoor and outdoor installations. Enclosures may include fixed and removable components and may be filled with fluid (liquid or gas) to provide insulation.

NOTE 1 EN 50163 specifies the AC traction systems 15 kV 16,7 Hz and 25 kV 50 Hz.

NOTE 2 This document applies to single-phase or two-phase systems.

For metal-enclosed traction switchgear containing gas-filled compartments, the design pressure is limited to a maximum of 300 kPa (relative pressure).

NOTE 3 EN 62271-203 can be used as a guide for design and testing in case the design pressure of gas-filled compartments exceeds 300 kPa (relative pressure).

Components contained in metal-enclosed traction switchgear are to be designed and tested in accordance with their various relevant standards. This document supplements the standards for the individual components regarding their installation in traction switchgear assemblies.

This document does not preclude that other equipment may be included in the same enclosure. In such a case, any possible influence of that equipment on the traction switchgear is to be taken into account.

NOTE 4 Traction switchgear having an insulation enclosure is covered by EN 62271-201. For definition see there or IEV 441-12-06.


Edition : 22
File Size : 1 file , 2.5 MB
Number of Pages : 46
Published : 03/01/2022

History


Related products

CEI EN 50131-10
Published Date: 03/01/2015
Alarm systems - Intrusion and hold-up systems Part 10: Application specific requirements for Supervised Premises Transceiver (SPT)
$10.2
CEI EN 62424
Published Date: 03/01/2017
Representation of process control engineering - Requests in P&I diagrams and data exchange between P&ID tools and PCE-CAE tools
$97.8
CEI 103-1/13
Published Date: 10/01/1999
Impianti telefonici interni - Parte 13: Criteri di installazione e reti
$9.3
CEI EN 50397-2
Published Date: 02/01/2023
Covered conductors for overhead lines and the related accessories for rated voltages above 1 kV a.c. and not exceeding 36 kV a.c. Part 1: Covered conductors
$24.6

Best-Selling Products

17807 TR 068B
Published Date: 01/08/2020
BASEMENT MANUAL
$23.4
17807 TR 090 CD
Published Date: 01/01/2002
Annotated Design & Construction Details for CM
$34.8
17807 TR 090
Published Date: 01/01/2002
Annotated & Construction Details for CM Design
$48.6
17807 TR 090B
Published Date: 01/08/2020
Annotated Design and Construction Details for CM
$48.6
17807 TR 091
Published Date: 01/01/2003
Concrete Lintels for Concrete Masonry Structures
$14.1
17807 TR 104
Published Date: 01/01/1989
Building Radon Resistant Foundations
$3.6