Name:
CEI EN 50629/A1 PDF
Published Date:
04/01/2017
Status:
[ Revised ]
Publisher:
Comitato Elettrotecnico Italiano
After the last item of the bulleted list “- large power transformers which are like for like replacements in the same physical location/installation for existing large power transformers, where this replacement cannot be achieved without entailing disproportionate costs associated to their transportation and/or installation.”,
“In case one of the last two exclusions is claimed, this should be documented at the signature of the contract with a declaration made by the customer.”.
| Edition : | 16 |
| File Size : | 1 file , 770 KB |
| Number of Pages : | 8 |
| Published : | 04/01/2017 |