CEI EN 61850-4/A1 PDF

CEI EN 61850-4/A1 PDF

Name:
CEI EN 61850-4/A1 PDF

Published Date:
08/01/2021

Status:
[ Active ]

Description:

Communication networks and systems for power utility automation Part 4: System and project management

Publisher:
Comitato Elettrotecnico Italiano

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$13.5
Need Help?
ENGLISH

This part of IEC 61850 applies to projects associated with processes near automation systems of power utilities (UAS, utility automation system), such as substation automation systems (SAS). It defines the system and project management for UAS with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements.


Edition : 12
File Size : 1 file , 2.8 MB
Number of Pages : 28
Published : 08/01/2021

History


Related products

CEI EN IEC 62484
Published Date: 10/01/2022
Radiation protection instrumentation - Spectrometric radiation portal monitors (SRPMs) used for the detection and identification of illicit trafficking of radioactive material
$27
CEI EN 50119
Published Date: 05/01/2010
Railway applications - Fixed installations - Electric traction overhead contact lines
$67.2
CEI EN 62453-303-1
Published Date: 07/01/2011
Field device tool (FDT) interface specification Part 303-1: Communication profile integration - IEC 61784 CP 3/1 and CP 3/2
$51.6
CEI UNI EN 16001
Published Date: 08/01/2010
Energy management systems - Requirements with guidance for use
$21.3

Best-Selling Products

NATO AACP-02.1
Published Date: 07/09/2019
COUNTRY POINTS OF CONTACT
NATO AACP-02
Published Date: 07/09/2019
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS
NATO AACP-1
Published Date: 01/01/1989
GUIDANCE FOR THE DRAFTING OF MOUS AND PROGRAMME MOUS - BASIC CONSIDERATIONS CHECKLIST
NATO AACP-2 VOL 10
Published Date: 02/14/2012
GUIDELINES FOR MUTUAL PROVISION OF CONTRACT AUDITS - VOLUME 10
NATO AACP-2 VOL 1
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR FEASIBILITY STUDY WORK - VOLUME 1
NATO AACP-2 VOL 2
Published Date: 09/01/1994
GUIDELINES ON CONTRACTUAL TERMS FOR PROJECT DEFINITION AND DESIGN AND DEVELOPMENT - VOLUME 2