CEI EN 61850-4 PDF

CEI EN 61850-4 PDF

Name:
CEI EN 61850-4 PDF

Published Date:
05/01/2012

Status:
[ Active ]

Description:

Communication networks and systems for power utility automation Part 4: System and project management

Publisher:
Comitato Elettrotecnico Italiano

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$50.7
Need Help?
ENGLISH

This part of IEC 61850 applies to projects associated with process near automation systems of power utilities (UAS, utility automation system), like e.g. substation automation systems (SAS). It defines the system and project management for UAS systems with communication between intelligent electronic devices (IEDs) in the substation respective plant and the related system requirements.

The specifications of this part pertain to the system and project management with respect to:

- the engineering process and its supporting tools;

- the life cycle of the overall system and its IEDs;

- the quality assurance beginning with the development stage and ending with discontinuation and decommissioning of the UAS and its IEDs.

The requirements of the system and project management process and of special supporting tools for engineering and testing are described.


Edition : 12
File Size : 1 file , 1 MB
Number of Pages : 44
Published : 05/01/2012

History


Related products

CEI EN 62282-3-200
Published Date: 10/01/2016
Fuel cell technologies Part 3-200: Stationary fuel cell power systems - Performance test methods
$33.3
CEI EN IEC 61158-2
Published Date: 06/01/2023
Industrial communication networks - Fieldbus specifications Part 2: Physical layer specification and service definition
$288.6
CEI EN 61909
Published Date: 11/01/2001
Audio recording - Minidisc system
$72.6
CEI EN IEC 60730-2-7
Published Date: 11/01/2020
Automatic electrical controls Part 2: Particular requirements for timers and time switches
$19.5

Best-Selling Products