CEI EN 62561-3 PDF

CEI EN 62561-3 PDF

Name:
CEI EN 62561-3 PDF

Published Date:
01/01/2018

Status:
[ Revised ]

Description:

Lightning Protection System Components (LPSC) Part 3: Requirements for isolating spark gaps (ISG)

Publisher:
Comitato Elettrotecnico Italiano

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.7
Need Help?

This part of IEC 62561 specifies the requirements and tests for isolating spark gaps (ISG) for lightning protection systems.

ISGs can be used to indirectly bond a lightning protection system to other nearby metalwork where a direct bond is not permissible for functional reasons.

Typical applications include the connection to

• earth-termination systems of power installations,

• earth-termination systems of telecommunication systems,

• auxiliary earth electrodes of voltage-operated, earth fault circuit breakers,

• rail earth electrode of power and DC railways,

• measuring earth electrodes for laboratories,

• installations with cathodic protection and stray current systems,

• service entry masts for low-voltage overhead cables,

• bypassing insulated flanges and insulated couplings of pipelines.

This does not cover applications where follow currents occur.

NOTE Lightning protection system components (LPSC) can also be suitable for use in hazardous conditions such as fire and explosive atmosphere. Due regard will be taken of the extra requirements necessary for the components to be installed in such conditions.


Edition : 18
File Size : 1 file , 2 MB
Number of Pages : 32
Published : 01/01/2018

History

CEI EN IEC 62561-3
Published Date: 01/01/2024
Lightning protection system components (LPSC) - Part 3: Requirements for isolating spark gaps (ISGs)
$16.8
CEI EN 62561-3
Published Date: 01/01/2018
Lightning Protection System Components (LPSC) Part 3: Requirements for isolating spark gaps (ISG)
$17.7
CEI EN 62561-3
Published Date: 04/01/2013
Lightning Protection System Components (LPSC) Part 3: Requirements for isolating spark gaps
$25.5

Related products

CEI EN 62634
Published Date: 01/01/2016
Radio Data System (RDS) - Receiver products and characteristics - Methods of measurement
$9.6
CEI EN IEC 61300-2-14
Published Date: 11/01/2021
Fibre optic interconnecting devices and passive components - Basic test and measurement procedures Part 2-14: Tests - High optical power
$15.9
CEI EN 50380
Published Date: 04/01/2018
Marking and documentation requirements for Photovoltaic Modules
$13.5
CEI EN 60255-11
Published Date: 05/01/2011
Measuring relays and protection equipment Part 11: Voltage dips, short interruptions, variations and ripple on auxiliary power supply port
$13.8

Best-Selling Products

BRE AP100
Published Date: 01/01/1995
Pfa concrete; Set of four reports (BR294 to BR297)
$19.5
BRE AP135
Published Date: 01/01/2000
Value management
$15.9
BRE AP138
Published Date: 01/01/2000
BR358 Quiet homes & BR406 Specifying dwellings with enhanced sound insulation
$17.1
BRE AP139
Published Date: 01/01/2000
Domestic energy fact file; Set of four reports
$41.4
BRE AP146
Published Date: 01/01/2002
Managing sustainable construction; Profiting from sustainability
$9.3
BRE AP147
Published Date: 01/01/2002
Thaumasite in cementitous materials; Proceedings of the first international conference BRE 19-21 June 2002
$87.3