CGA H-11 PDF

CGA H-11 PDF

Name:
CGA H-11 PDF

Published Date:
05/20/2020

Status:
Active

Description:

Safe Startup and Shutdown Practices for Steam Reformers

Publisher:
Compressed Gas Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$35.1
Need Help?

This publication applies to steam reformers that are operated with natural gas, refinery off gas, naphtha, and other light hydrocarbon streams. It specifically applies to large volume hydrogen production plants, defined for this publication as a production capacity of 380 000 scfh (10 000 Nm3h) (9 MMSCFD or 240 000 Nm3D) or greater. This publication may be applied to smaller reformers depending on the technology used.

This publication covers operational safety of steam reformer startup and shutdown. Emphasis is placed on operational guidance and features that provide safeguards against the hazards associated with the transition and infrequent nature of startups and shutdowns. The publication is not intended to address the details of design, installation, construction, and initial startup (commissioning) of steam reformers.


Edition : 2nd
File Size : 1 file , 1 MB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 26
Published : 05/20/2020

History

CGA H-11
Published Date: 05/20/2020
Safe Startup and Shutdown Practices for Steam Reformers
$35.1
CGA H-11
Published Date: 12/01/2013
Safe Startup and Shutdown Practices for Steam Reformers, First Edition

Related products

CGA E-18
Published Date: 12/04/2019
Standard for Medical Gas Valve Integrated Pressure Regulators
$38.4
CGA E-8
Published Date: 09/25/2020
Guideline for Gas Flowmeters
$7.5
CGA E-1
Published Date: 10/06/2022
Standard for Rubber Welding Hose and Hose Connections for Gas Welding, Cutting, and Allied Processes
$26.4

Best-Selling Products