CGA TB-25 PDF

CGA TB-25 PDF

Name:
CGA TB-25 PDF

Published Date:
04/24/2013

Status:
Active

Description:

Design Considerations for Tube Trailers

Publisher:
Compressed Gas Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$5.4
Need Help?
This publication presents design considerations for tube trailers used to transport compressed gases. These guidelines are intended to promote the reliable operation of the trailers under normal conditions and minimize the risk of a catastrophic incident in the event of an accident. Current edition referenced by DOT.
Edition : 3rd
File Size : 1 file , 36 KB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 4
Published : 04/24/2013

History

CGA C-29
Published Date: 11/08/2019
Standard for Design Requirements for Tube Trailers and Tube Modules (Formerly TB-25)
$7.5
CGA TB-25
Published Date: 04/24/2013
Design Considerations for Tube Trailers
$5.4
CGA TB-25
Published Date: 04/15/2008
Design Considerations for Tube Trailers

Related products

CGA TB-22 (R2014)
Published Date: 09/13/2006
Guidelines for the Inspection, Maintenance, and Requalification of Liquefied Petroleum Gas Cylinders
$3
CGA V-21
Published Date: 02/14/2019
Torque Guidelines for Sealing CGA Valve Outlet Connections (Formerly TB-14)
$5.7
CGA TB-8 (R2016)
Published Date: 09/01/2009
Evidence of Ownership of Compressed Gas Cylinders
$1.5
CGA C-26
Published Date: 08/24/2021
Guideline for the Post Manufacture Tare Weight Marking of Cylinders
$7.5

Best-Selling Products

TELCORDIA FR-RTP-1-CD-21-100USERS
Published Date: 02/01/2003
Release to Pivot (RTP) Family of Requirements (RTPFR), FR-RTP-1
TELCORDIA FR-SONET-17-CD-1USER
Published Date: 02/01/2003
Broadband and Transport Network Generic Requirements: SONET and ATM Transport Technologies
TELCORDIA FR-SONET-17-CD-6-20USER
Published Date: 02/01/2003
Broadband and Transport Network Generic Requirements: SONET and ATM Transport Technologies
TELCORDIA GR-1009
Published Date: 11/01/1994
Generic Requirements for Fiber Optic Clip-on Test Sets
TELCORDIA GR-1031
Published Date: 10/01/1997
OTGR Section 15.6: Operations Interfaces Using OSI Tools: Test Access Management
TELCORDIA GR-1042
Published Date: 12/01/1998
Generic Requirements for Operations Interfaces Using OSI Tools - Information Model Overview: Synchronous Optical Network (SONET) Transport Information Model