CGA V-11 PDF

CGA V-11 PDF

Name:
CGA V-11 PDF

Published Date:
04/19/2018

Status:
Active

Description:

Guideline for the Installation of Valves into High Pressure Aluminum Alloy Cylinders

Publisher:
Compressed Gas Association

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$11.4
Need Help?

Correct valve installation into aluminum alloy cylinders is essential to ensure a proper fit, performance, and leak-tight seal. Failure to perform this installation properly can result in the loss of the cylinder contents and/or the valve ejection from the cylinder, which can lead to damage to property, serious personal injury, and/or death.

This publication provides recommended guidelines for developing procedures for valve installation into high pressure aluminum alloy cylinders for thread designs developed in the United States. For guidance on devalving cylinders, see CGA P-38, Guideline for Devalving Cylinders.


Edition : 3rd
File Size : 1 file , 990 KB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 12
Published : 04/19/2018

History

CGA V-11
Published Date: 04/19/2018
Guideline for the Installation of Valves into High Pressure Aluminum Alloy Cylinders
$11.4
CGA V-11
Published Date: 08/01/2011
General Guidelines for the Installation of Valves into High Pressure Aluminum Alloy Cylinders, Second Edition
CGA V-11
Published Date: 05/04/2005
General Guidelines for the Installation of Valves into High Pressure Aluminum Alloy Cylinders

Related products

CGA V-5
Published Date: 05/24/2019
Standard for Diameter Index Safety System (Noninterchangeable Low Pressure Connections for Medical Gas Applications)
$27.9
CGA V-9
Published Date: 04/23/2024
Standard for Compressed Gas Cylinder Valves
$66.6
CGA V-16
Published Date: 09/07/2023
Guideline for the Application of CGA Publications to Cylinder Valves
$8.1

Best-Selling Products