CII IR316-2 PDF

CII IR316-2 PDF

Name:
CII IR316-2 PDF

Published Date:
03/31/2016

Status:
Active

Description:

A Guide to Instantaneous Project Controls

Publisher:
Construction Industry Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$60
Need Help?
Volume I presents the nine instantaneous controls implementation strategies that make up the Instantaneous Controls Maturity Matrix, in three categories: organizational behavior, project controls, and advanced information technologies. Introduces and provides guidance on using the three maturity matrix-based tools: 1) the Instantaneous Quotient (IQ) tool; 2) the Quick Assessment (QA) tool; and 3) the Workflow Implementation Process tool. Also addresses implementation considerations and offers narratives of three industry implementations of instantaneous controls.

Volume II presents the results of 10 case studies conducted by RT-316 of organizations implementing instantaneous controls, with samples from the construction, technology, manufacturing, and aerospace sectors. Addresses the resources required both for comprehensive controls efforts and for real-time reporting functions with very specific (narrower) scopes.

NOTE: This publication's accompanying beta software is a proof of concept and is available for informational purposes only.

By downloading or purchasing this publication, you understand and accept that its accompanying software may stop opening or running properly on future platforms and is not supported or maintained by CII.

Both the publication and its software are protected by applicable copyright restrictions as set forth by CII.

Any party interested in adapting this software is invited to contact CII Associate Director for Deployment to discuss licensing.
File Size : 1 file , 1.8 MB
Number of Pages : 66
Published : 03/31/2016

History


Related products

CII IR107-2
Published Date: 08/31/1996
Continuous Assessment of Project Performance
$60
CII IR322-2
Published Date: 10/31/2016
Project Controls Improvement Tool and User Guide
$60
CII RS107-1
Published Date: 02/01/1996
Predictive Tools: Closing the Performance Gap
$12
CII RS6-6
Published Date: 11/01/1988
Work Packaging for Project Control
$12

Best-Selling Products

DIN/IEC 212
Published Date: 09/01/1995
Standard Conditions for Use Prior to and During the Testing of Solid Electrical Insulating Materials - GERMAN ONLY
DIN/IEC 60512-2 Amendment 1
Published Date: 08/01/1995
Electromechanical Components for Electronic Equipment - Basic Testing Procedures and Measuring Methods - Part 2: General Examination, Electrical Continuity and Contact Resistance Tests, Insulation Tests and Voltage Stress Tests - GERMAN ONLY
DIN/IEC 60512-2
Published Date: 05/01/1994
Electromechanical Components for Eelectronic Equipment; Basic Testing Procedures and Measuring Methods; Part 2: General Examination, Electrical Continuity and Contact Resistance Tests, Insulation Tests and Voltage Stress Tests - GERMAN ONLY
DIN/IEC 60512-3
Published Date: 05/01/1994
Electromechanical Components for Electronic Equipment; Basic Testing Procedures and Measuring Methods; Part 3: Current-Carrying Capacity Tests - GERMAN ONLY
DIN/IEC 60512-4
Published Date: 05/01/1994
Electromechanical Components for Electronic Equipment; Basic Testing Procedures and Measuring Methods; Part 4: Dynamic Stress Tests - GERMAN ONLY
DIN/IEC 60512-5
Published Date: 05/01/1994
Electromechanical Components for Electronic Equipment; Basic Testing Procedures and Measuring Methods; part 5: Impact Tests (Free Components), Static Load Tests (Fixed Components), Endurance Tests and Overload Tests - GERMAN ONLY