CII IR48-2 PDF

CII IR48-2 PDF

Name:
CII IR48-2 PDF

Published Date:
11/01/1995

Status:
Active

Description:

Environmental Remediation Management: An Eight-Step Process

Publisher:
Construction Industry Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$60
Need Help?
Provides a proactive management process for contaminated site remediation projects. Identifies key management issues and actions that should be taken along each step in the process.
File Size : 1 file , 2.8 MB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 118
Published : 11/01/1995

History


Related products

CII IR304-2
Published Date: 10/31/2014
A Framework for Sustainability during Construction
$84
CII RR250-11
Published Date: 10/01/2008
Sustainable Industrial Construction
$48
CII BMM2004-10
Published Date: 10/01/2004
Best Practices for Project Security
$36
CII IR-BMM-3
Published Date: 07/01/2005
Implementing Project Security Practices
$36

Best-Selling Products

ICEA P-117-734-2016
Published Date: 02/23/2016
Ampacities For Single-Conductor Solid Dielectric Power Cable 15 kV Through 35 kV
$90
ICEA P-117-734-2022
Published Date: 07/06/2022
Ampacities For Single-Conductor Solid Dielectric Power Cable 15 kV Through 35 kV
$96
ICEA P-123-739-2018
Published Date: 01/18/2018
GUIDE TO ESTABLISH ELECTRICAL TEST METHODS FOR NON-CONDUCTING JACKET MATERIALS FOR POWER CABLES RATED 5 TO 500 KV
$22.5
ICEA P-124-736-2021
Published Date: 06/03/2021
Code Words for 600 Volt Underground Distribution Cables
$13.5
ICEA P-127-737-2021
Published Date: 06/03/2021
Code Words for Overhead Aluminum Covered Conductors and 600 Volt Overhead Cables
$13.5
ICEA P-136-726-2024
Published Date: 2024
Guide for Pellet Inspection Systems for Unfilled Power Cable Insulation Compound
$29.1