CII RR47-11 PDF

CII RR47-11 PDF

Name:
CII RR47-11 PDF

Published Date:
05/01/1996

Status:
Active

Description:

Improving Industrial Piping Through Vendor Data and Packaged Units Processes

Publisher:
Construction Industry Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$48
Need Help?
This publication has been archived, but is available for download for informational purposes only.

O'Connor, Goucha, Univ. of Texas at Austin
File Size : 1 file , 5.2 MB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 164
Published : 05/01/1996

History


Related products

CII IR245-2
Published Date: 09/30/2015
Maximizing Engineering Value and Design Effectiveness Toolkit
$60
CII RR311-11
Published Date: 08/01/2016
Successful Delivery of Flash Track Projects
$48
CII SD-26
Published Date: 04/01/1987
Input Variables Impacting Design Effectiveness
$48
CII RR112-11
Published Date: 05/01/1998
A Framework and Practices for Cost-Effective Engineering in Capital Projects in the A/E/C Industry
$48

Best-Selling Products

NHS C 19-1:2020
Published Date: 07/06/2020
COVID-19 — Part 1: Infection control specifications for building and construction sites — The Federation of Norwegian Construction Industries (BNL) — Rev.3
NHS C 19-2:2020
Published Date: 11/09/2020
COVID-19 — Part 2: Infection control measures at concerts and events — Rev.1
NHS C 19-3:2020
Published Date: 11/05/2020
COVID-19 — Part 3: Infection control measures for cleaning companies — Rev.1
NHS C 19-5:2020
Published Date: 11/01/2020
COVID-19 — Part 5: Infection control measures for the automotive sector — Rev.3
NHS C 19-6-1:2020
Published Date: 11/24/2020
COVID-19 — Part 6-1: Specified infection control measures for retail in the city of Oslo — Rev.1
NHS C 19-6:2020
Published Date: 11/23/2020
COVID-19 — Part 6: Infection control measures for retail — Rev.1