CII RS133-1 PDF

CII RS133-1 PDF

Name:
CII RS133-1 PDF

Published Date:
12/01/1997

Status:
Active

Description:

Project Delivery Systems: CM at Risk, Design-Build, Design-Bid-Build

Publisher:
Construction Industry Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$12
Need Help?
This publication has been archived, but is available for download for informational purposes only.

Summarizes research conducted by the Design-Build Research Team. Based on a database of over 350 projects, the results show that design-build is a method that can be used without the cost and schedule growth of the other two delivery systems.
File Size : 1 file , 210 KB
Note : This product is unavailable in Russia, Belarus
Number of Pages : 34
Published : 12/01/1997

History


Related products

CII RS5-3
Published Date: 11/02/1988
Contract Risk Allocation and Cost Effectiveness
$12
CII IR133-2
Published Date: 12/01/1999
Project Delivery System Selection Workbook
$60
CII SD-14
Published Date: 04/05/1986
An Analysis of Construction Contract Change Clauses, Volume I
$48
CII RR130-11
Published Date: 06/01/1998
PEpC: A Breakthrough Project Delivery System That Improves Performance by Reforming Owner, Contractor, Supplier Relationships
$48

Best-Selling Products

AHAM AC-1-2006
Published Date: 2006
Air Cleaners - Portable - CADR
$30
AHAM AC-1-2018
Published Date: 2018
Method for Measuring Performance of Portable Household Electric Room Air Cleaners
$33
AHAM AC-1-2020
Published Date: 12/14/2020
Method for Measuring Performance of Portable Household Electric Room Air Cleaners
$33
AHAM AC-2-2006 (R2016)
Published Date: 2006
Method for Sound Testing of Portable Household Electric Room Air Cleaners
$12
AHAM AC-3-2009
Published Date: 2009
Room Air Cleaners
$12
AHAM AC-4-2022
Published Date: 07/22/2022
Method of Assessing the Reduction Rate of Chemical Gases by a Room Air Cleaner
$60