CII RS255-1 PDF

CII RS255-1 PDF

Name:
CII RS255-1 PDF

Published Date:
04/01/2011

Status:
Active

Description:

Transforming Modular Construction for the Competitive Advantage through the Adaptation of Shipbuilding Production Processes to Construction

Publisher:
Construction Industry Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$12
Need Help?
Focuses on evaluating the potential for the construction industry's use of the Interim Product Database Process (IPD), a process used by the shipbuilding industry, incorporating scalable, pre-designed blocks/modules that consist of hierarchical interim sub-assemblies, stored in an all-encompassing database. Identifies examples of construction projects that have incorporated one or more aspects of the IPD process and that have moved beyond the standard "one-off" modular construction approach. Presents case studies from a broad cross section of the industry that include pharmaceutical (manufacturing and R&D), petrochemical, residential, office, hospitality, and civil works (dams and bridges).
File Size : 1 file , 1.1 MB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 42
Published : 04/01/2011

History


Related products

CII IR171-2
Published Date: 12/31/2016
Prefabrication, Preassembly, Modularization, and Offsite Fabrication: Decision Framework and Tool, Version 1.1
$60
CII RR171-11
Published Date: 09/01/2002
Preliminary Research on Prefabrication, Pre-assembly, Modularization, and Off-site Fabrication in Construction
$48
CII RR283-11
Published Date: 04/01/2013
Industrial Modularization: How to Optimize; How to Maximize
$48
CII IR283-2
Published Date: 02/01/2014
Industrial Modularization: Five Solution Elements, Version 1.1
$60

Best-Selling Products

AODC 035
Published Date:
Code of Practice for the Safe Use of Electricity Underwater