Identifies the process, benefits, and implications of using probabilistic analysis of cost and schedule risks in the design and construction of capital projects. Presents the results of a thorough literature review and a state-of-practice survey. Also discusses the "how" and "why" of probabilistic methods through multiple case studies, and a validation survey to confirm all findings. Finally, introduces the team's implementation resources, a risk register tool and a laminated risk register reference card.
NOTE: Actual tools included with IR280-2.
| File Size : | 1
file
, 560 KB |
| Note : | This product is unavailable in Russia, Ukraine, Belarus |
| Number of Pages : | 33 |
| Published : | 10/01/2012 |