CII RS43-2 PDF

CII RS43-2 PDF

Name:
CII RS43-2 PDF

Published Date:
12/01/1994

Status:
Active

Description:

Quantitative Effects of Project Change

Publisher:
Construction Industry Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$12
Need Help?
Identifies correlation between the proportional amount of change on a project and labor productivity in design engineering and construction.
File Size : 1 file , 150 KB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 34
Published : 12/01/1994

History


Related products

CII FR-341
Published Date: 06/30/2019
Integrated Project Delivery for Industrial Projects
$60
CII SD-108
Published Date: 05/01/1995
Quantitative Impacts of Project Change
$48
CII IR303-2
Published Date: 10/01/2014
Managing a Portfolio of Projects: A Playbook for Success
$60
CII RR158-11
Published Date: 02/01/2001
Quantifying the Cumulative Impact of Change Orders for Electrical and Mechanical Contractors
$48

Best-Selling Products

TIA 152-C
Published Date: 01/01/1988
Minimum Standards for Land Mobile Communication FM or PM Transmitters, 25-866 MHz
$29.7
TIA 200-A
Published Date: 03/01/1965
Circular Waveguides
$19.2
TIA 252-A
Published Date: 09/01/1972
Microwave Transmission Systems
$35.7
TIA 363
Published Date: 01/01/1969
Specifying Signal Quality for Transmitting and Receiving Data Processing Terminal Equipments Using Serial Data Transmission at the Interface with Non-Synchronous Data Communication Equipment
$25.2
TIA 366-A
Published Date: 01/01/1979
Interface between Data Terminal Equipment and Automatic Calling Equipment for Data Communication
$31.5
TIA 374-A
Published Date: 10/08/2002
Land Mobile Signalling Standard
$32.7