CII SD-98 PDF

CII SD-98 PDF

Name:
CII SD-98 PDF

Published Date:
08/01/1994

Status:
Active

Description:

Effects of Scheduled Overtime on Labor Productivity: A Quantitative Analysis

Publisher:
Construction Industry Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
cii-sd-98_2089965

Choose Document Language:
48.00 €
Need Help?
Thomas, Raynor, Penn State Univ.
File Size : 1 file , 1.4 MB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 57
Published : 08/01/1994

History


Related products

CII FR-TC-01
Published Date: 03/01/2019
Bridging the Gap between Design and Construction Models to Improve Advanced Work Packaging
60.00 €
CII RS191-1
Published Date: 10/01/2005
Lean Principles in Construction
12.00 €
CII RS2-2
Published Date: 11/01/1988
Construction Industry Institute Model Plant Update
12.00 €
CII RS2-3
Published Date: 10/01/1990
Productivity Measurement: An Introduction
12.00 €

Best-Selling Products

NAAMM AMP 500-06
Published Date: 01/01/2006
Metal Finishes Manual
NAAMM AMP 510-92
Published Date: 01/01/1992
Metal Stairs Manual
NAAMM AMP 521-01 (R2012)
Published Date: 01/01/2001
Pipe Railing Manual
NAAMM AMP 555-92
Published Date: 01/01/1992
Code of Standard Practice for the Architectural Metal Industry (Including Miscellaneous Iron)
NAAMM FP 1001-07
Published Date: 10/05/2007
Guide Specifications for Design of Metal Flagpoles
9.00 €
NAAMM HMMA 850-00
Published Date: 01/01/2000
Fire Rated Hollow Metal Doors & Frames