CII WS213-01 PDF

CII WS213-01 PDF

Name:
CII WS213-01 PDF

Published Date:
06/30/2014

Status:
Active

Description:

Front End Planning: Your Key to a Successful Project

Publisher:
Construction Industry Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
Capital project delivery risk is greatly affected by the quality of the front end planning (FEP) effort. This process has become a key focus of many organizations in recent years. All projects have unique risks that must be addressed to ensure that the project is the correct venture for the sponsoring organization, that the important scope issues are set to form a good design basis, and that the execution approach is addressed to allow the project team to smoothly transition through the design process, construction and into effective startup and operations. An effective, structured front end planning process will therefore facilitate project success. Industry owners report that on average, projects intensely implementing FEP realize a 8.6% cost advantage over projects implementing FEP less intensely. Research conducted by the CII indicates that effective front end planning can set the stage for:
  • better cost performance, including more predictable estimates and reduced project cost
  • reduced project schedules
  • fewer project changes
  • better operational performance
  • a reduced chance of project disasters
CII has developed a process and several tools that, if employed can significantly improve the front end planning process on projects. This 2-DVD set provides a solid overview of the front end planning process as conducted by world-class organization.

This video product is not currently available for online access or download, but is sold in DVD format.
Published : 06/30/2014

History


Related products

CII IR102-2
Published Date: 11/30/1996
Partnering ToolKit
$60
CII IR111-3
Published Date: 08/01/2005
Core Competency Toolkit
$60
CII IR204-2
Published Date: 09/30/2006
Project Priority Calculator
$60
CII IR326-2
Published Date: 10/31/2016
VIRTUOSO: High Performance Virtual Team Equalizer
$60

Best-Selling Products

The Macintosh Bible
Published Date: 10/01/1998
$10.5