Construction: A Practical Guide to RIBA Plan of Work 2013 Stages 4, 5 and 6 (RIBA Stage Guide) PDF

Construction: A Practical Guide to RIBA Plan of Work 2013 Stages 4, 5 and 6 (RIBA Stage Guide) PDF

Name:
Construction: A Practical Guide to RIBA Plan of Work 2013 Stages 4, 5 and 6 (RIBA Stage Guide) PDF

Published Date:
07/02/2015

Status:
[ Active ]

Description:

Publisher:
CRC Press Books

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
construction-a-practical-guide-to-riba-plan-of-work-2013-stages-4-5-and-6-riba-stage-guide_2881221

Choose Document Language:
25.50 €
Need Help?
ISBN: 9781000700473

This is the third in a must-have series of step-by-step guides to using the new RIBA Plan of Work 2013 on your project. Drawing together stages 4, 5 and 6 this book explains what needs to have been achieved for Technical Design to begin, how to achieve success in the construction phase as well as the importance of a comprehensive Handover Strategy.

Providing a practical tool to running an efficient project each guide follows the same format leading you through the core tasks at each stage supported by tips, definitions, templates and useful techniques. Five theoretical scenarios are used throughout the guides to illustrate how the Plan of Work can be applied on various project types and sizes including an extension to a house, a new library and a large office building.

These guides will provide unrivalled support for practices on all projects – large and small – and across all types of procurement.

Author: Phil Holden


Edition : 1
Number of Pages : 181
Published : 07/02/2015
isbn : 9781000700473

History


Related products


Best-Selling Products

UNE-CLC/TR 50373:2006 IN
Published Date: 06/07/2006
Wind turbines - Electromagnetic compatibility
UNE-CLC/TR 50453:2008 IN
Published Date: 11/26/2008
Evaluation of electromagnetic fields around power transformers
UNE-CLC/TR 50462:2009
Published Date: 10/14/2009
Rules for the determination of uncertainties in the measurement of the losses on power transformer and reactors
UNE-CLC/TR 50488:2007 IN
Published Date: 07/18/2007
Railway applications - Safety measures for the personnel working on or near overhead contact lines