Extensions of Time PDF

Extensions of Time PDF

Name:
Extensions of Time PDF

Published Date:
07/26/2019

Status:
[ Active ]

Description:

Publisher:
CRC Press Books

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
Need Help?
ISBN: 9781000703641 * NO LONGER AVAILABLE

This is a straight forward jargon-free practical guide about all aspects of extensions of time for all construction industry professionals.

An extension of time is an issue which most architects and other construction professionals face sooner or later in their career. It is a complex area where the professional administering the contract must act in accordance with the contract conditions andfailure to do so will potentially land the professional and/or his client in court.

Throughout the guide the information is presented in a way that is immediately accessible, useful and related to the latest JCT Contracts. Tables, graphs and a glossary are used to help the reader navigate through chapters on liquidated damages, terms under standard contracts, notification of delay, supply of information, assessment, concurrent delays and ethical issues.

The authors have clarified potentially complex issues with short, relevant examples drawn from case law and have defined difficult concepts in easy-reference text boxes. This Good Practice Guide is a friendly reference tool for all architects or other professionals charged with assessing extensions of time.

Author: Gillian Birkby


Edition : 1
Number of Pages : 145
Published : 07/26/2019
isbn : 9781000703641

History


Related products

Diagnostic Devices with Microfluidics
Published Date: 06/14/2017
$49.5
Optical Computing
Published Date: 01/01/1989
$140.4

Best-Selling Products

PEI RP100-05
Published Date: 2005
Recommended Practices for Installation of Underground Liquid Storage Systems
$118.5
PEI RP100-11
Published Date: 2011
Recommended Practices for Installation of Underground Liquid Storage Systems (2011 Edition)
$118.5
PEI RP100-20 Errata (Spanish)
Published Date: 2020
Errata for Recommended Practices for Installation of Underground Liquid Storage Systems (2020 Edition)
Free Download
PEI RP100-20 Errata
Published Date: 2020
Errata for Recommended Practices for Installation of Underground Liquid Storage Systems (2020 Edition)
Free Download
PEI RP100-20
Published Date: 2020
Recommended Practices for Installation of Underground Liquid Storage Systems (2020 Edition)
$118.5
PEI RP100-22
Published Date: 2022
Recommended Practices for Installation of Underground Liquid Storage Systems (2022 Edition)
$118.5