CSA C22.2 No. 335:21 PDF

CSA C22.2 No. 335:21 PDF

Name:
CSA C22.2 No. 335:21 PDF

Published Date:
07/01/2021

Status:
Active

Description:

Pullout switches

Publisher:
CSA Group

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$78
Need Help?

Preface 

This is the first edition of CSA C22.2 No. 335, Pullout Switches . It supersedes and replaces the Technical Information Letter on Interim Certification Requirements for Pullout Switches, which was issued in 2016 as CSA T.I.L. D-35. It is one in a series of Standards issued by CSA Group under Part II of the Canadian Electrical Code. This Standard has been developed in compliance with Standards Council of Canada requirements for National Standards of Canada. It has been published as a National Standard of Canada by CSA Group. 

Scope 

1.1 This Standard applies to non-enclosed and enclosed pullout switches of the detachable type, rated up to 600 V and 400 A. The equipment specified in this Standard is intended for installation in accordance with CSA C22.1, Canadian Electrical Code, Part I. 

1.2 These requirements do not apply to hinged pullout switches which are covered in CAN/CSA-C22.2 No. 4. 

1.3 These requirements do not apply to enclosed pullout switches containing more than one independent switch which are covered in CSA C22.2 No. 29. 

1.4 In this Standard, "shall" is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; "should" is used to express a recommendation or that which is advised but not required; and "may" is used to express an option or that which is permissible within the limits of the Standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (non-mandatory) to define their application.


File Size : 1 file , 910 KB
ISBN(s) : 9781488333071
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 58
Product Code(s) : 2428684, 2428684
Published : 07/01/2021

History


Related products


Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138