CSA N285.4:19 PDF

CSA N285.4:19 PDF

Name:
CSA N285.4:19 PDF

Published Date:
06/01/2019

Status:
Active

Description:

Periodic inspection of CANDU nuclear power plant components, Includes Update No. 1 (2021) and Errata (2023)

Publisher:
CSA Group

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$717
Need Help?
Scope

1.1 This Standard defines requirements for the periodic inspection of pressure retaining systems, components, and supports that form part of a CANDU nuclear power plant. Periodic inspection (see Annex A for additional guidance) is considered to include the fluid boundary portions of components and piping, including their supports that comprise
a) systems containing fluid that directly transports heat from nuclear fuel and other systems whose failure can result in a significant release of radioactive substance;
b) systems essential for the safe shutdown of the reactor or the safe cooling of the fuel, or both, in the event of a process system failure; and
c) other systems or components whose failure could jeopardize the integrity of the systems described in Item a) or b), or both. In addition, for components exposed to conditions beyond the known experience base, and where such components constitute part of a vital system, the components may be considered suitable for inclusion in the periodic inspection program, as supplementary periodic inspections.

1.2 This Standard addresses
a) failure aspects;
b) classification of areas subject to periodic inspection;
c) provision for access;
d) examination methods and procedures;
e) personnel qualifications;
f) frequency of periodic inspection;
g) responsibilities;
h) documentation;
i) records;
j) evaluation of periodic inspection results;
k) dispositioning; and
l) repair, replacement, and modification requirements.

1.3 In this Standard, "shall" is used to express a requirement, i.e., a provision that the user is obliged to satisfy in order to comply with the standard; "should" is used to express a recommendation or that which is advised but not required; and "may" is used to express an option or that which is permissible within the limits of the standard. Notes accompanying clauses do not include requirements or alternative requirements; the purpose of a note accompanying a clause is to separate from the text explanatory or informative material. Notes to tables and figures are considered part of the table or figure and may be written as requirements. Annexes are designated normative (mandatory) or informative (nonmandatory) to define their application.
Edition : 7th
File Size : 1 file , 2.2 MB
ISBN(s) : 9781488320125
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 219
Product Code(s) : 2427332, 2426912, 2427332
Published : 06/01/2019

History

CSA N285.4:23
Published Date: 11/15/2023
Periodic inspection of CANDU nuclear power plant components
$757.5
CSA N285.4:19
Published Date: 06/01/2019
Periodic inspection of CANDU nuclear power plant components, Includes Update No. 1 (2021) and Errata (2023)
$717
CSA N285.4-14
Published Date: 05/01/2014
Periodic inspection of CANDU nuclear power plant components
$717
CSA N285.4-09
Published Date: 06/01/2009
Periodic inspection of CANDU nuclear power plant components, Includes Update No. 1 (2010), Update No. 2 (2011)
$717
CSA N285.4-05
Published Date: 06/08/2005
Periodic Inspection of CANDU Nuclear Power Plant Components, Includes Update No. 1 (2007)
$717

Related products

CSA N288.5:22
Published Date: 02/07/2022
Effluent and emissions monitoring programs at nuclear facilities
$357
CSA N289.5-12 (R2022)
Published Date: 07/31/2012
Seismic Instrumentation Requirements for nuclear power plants and nuclear facilities, Includes Update No. 1 (2021)
$207
CSA N288.7:23
Published Date: 08/23/2023
Groundwater protection programs at Class I nuclear facilities and uranium mines and mills
$297
CSA N299.2:19
Published Date: 12/01/2019
Quality assurance program requirements for the supply of items and services for nuclear power plants, Category 2, Includes Update No. 1 (2023)
$267

Best-Selling Products

THHILL DS-1 BITS
Published Date: 02/01/2017
Bit Inspection Technical Standard
330.00 250.00 you save 80.00
THHILL DS-1 VOL 1 ADDENDUM 3
Published Date: 02/07/2018
Drilling Tubular Product Specification
THHILL DS-1 VOL 1
Published Date: 08/01/2020
Drilling Tubular Product Specification
330.00 275.00 you save 55.00
THHILL DS-1 VOL 1
Published Date: 05/01/2012
Drilling Tubular Product Specification
$82.5
THHILL DS-1 VOL 1
Published Date: 05/01/2012
Drilling Tubular Product Specification
THHILL DS-1 VOL 1
Published Date: 05/01/2012
Drilling Tubular Product Specification