CSA N290.0-11 (R2016)/N290.1-13 (R2018) PACKAGE PDF

CSA N290.0-11 (R2016)/N290.1-13 (R2018) PACKAGE PDF

Name:
CSA N290.0-11 (R2016)/N290.1-13 (R2018) PACKAGE PDF

Published Date:
12/01/2013

Status:
Active

Description:

N290.0-11, General requirements for safety systems of nuclear power plants and N290.1-13, Requirements for the shutdown systems of nuclear power plants

Publisher:
CSA Group

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$237
Need Help?
N290.0-11: This Standard is one of a series of standards on reactor control systems, safety systems, and instrumentation for nuclear power plants.

Scope
1.1 This Standard covers the design, qualification, installation, operation, maintenance, inspection, and documentation of the safety systems for a water-cooled nuclear power plant.

1.2 This Standard provides the general requirements for the safety systems. This Standard is a companion document of CSA N290.2 and N290.3, which outline specific requirements.

N290.1-13: This Standard has been written as a general standard for reactor shutdown systems of nuclear power plants. It establishes the design, procurement, installation, commissioning, operation, testing, and maintenance requirements of the shutdown system(s) to terminate the fission chain reaction in the event of an accident. This Standard is one of a series of standards on reactor control systems, safety systems, and instrumentation for nuclear power plants.

Scope
1.1 This Standard applies to the design, procurement, installation, commissioning, operation, testing, and maintenance requirements of reactor shutdown systems (SDSs) for existing and new water-cooled nuclear power plants (NPPs), both CANDU® and non-CANDU®.

Notes:
1) "Existing nuclear power plants" refers to those licensed for operation prior to 2013.
2) The requirements for new plants and existing plants might differ. Where requirements differ for new plants and existing plants, the differences are explicitly stated.
3) This Standard does not apply to NPPs smaller than 200 MW thermal power.

1.2 This Standard is written as a companion document to CSA N290.0, which provides general requirements for the NPP safety systems, including the reactor SDS. This Standard and its companion CSA N290.0 provide the requirements for the reactor SDS.

1.3 This Standard is written to be "technology neutral". This Standard uses the term "reactor shutdown system" (SDS), which includes the following functions: detection, actuation, and means of shutdown (MSD).

Note: In non-CANDU® plants, the "protection system" perform detection and actuation (see 10-CFR-50 Appendix A Criterion 20).
File Size : 1 file , 1.4 MB
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 70
Product Code(s) : 2423092, 2423420, 2423092
Published : 12/01/2013

History

CSA N290.0-11 (R2016)/N290.1-13 (R2018) PACKAGE
Published Date: 12/01/2013
N290.0-11, General requirements for safety systems of nuclear power plants and N290.1-13, Requirements for the shutdown systems of nuclear power plants
$237

Related products

CSA N287.5:20
Published Date: 07/01/2020
Examination and testing requirements for concrete containment structures for nuclear power plants
$237
CSA N287.3-14 (R2024)
Published Date: 02/01/2014
Design Requirements for Concrete Containment Structures for Nuclear Power Plants
$387
CSA N288.1:20
Published Date: 03/01/2020
Guidelines for modelling radionuclide environmental transport, fate, and exposure associated with the normal operation of nuclear facilities, Includes Errata (2020), Errata (2022) and Update No. 1 (2024)
$537
CSA N287.2-17 (R2022)
Published Date: 10/01/2017
Material Requirements for Concrete Containment Structures for Nuclear Power Plants
$267

Best-Selling Products

AVIXA A102.01
Published Date: 04/11/2017
Audio Coverage Uniformity in Listener Areas
$22.5
AVIXA ANSI/INFOCOMM 10
Published Date: 12/20/2013
Audiovisual Systems Performance Verification
$22.5
AVIXA ANSI/INFOCOMM 2M
Published Date: 12/05/2010
Standard Guide for Audiovisual Systems Design and Coordination Processes
$22.5
AVIXA ANSI/INFOCOMM 3M
Published Date: 06/30/2011
Projected Image System Contrast Ratio
$22.5
AVIXA ANSI/INFOCOMM 4
Published Date: 06/19/2012
Audiovisual Systems Energy Management
$22.5
AVIXA F501.01
Published Date: 12/31/2015
Cable Labeling for Audiovisual Systems
$22.5