CTI TP00-06 PDF

CTI TP00-06 PDF

Name:
CTI TP00-06 PDF

Published Date:
02/02/2000

Status:
Active

Description:

A New Look at Recirculation Analysis Including Measure of a 50 Cell Cooling Tower

Publisher:
Cooling Technology Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.2
Need Help?

File Size : 1 file , 4.4 MB
Number of Pages : 26
Published : 02/02/2000

History


Related products

CTI TP-77-12b
Published Date: 01/01/1977
CTI Water Cooling Tower Thermal Performance - Testing Procedures and Instrumentations
$4.2
CTI TP01-13
Published Date: 02/28/2001
Circulating Water Flow Measurements - A Study
$4.2
CTI TP77-11
Published Date: 01/01/1977
Field Examination of Cooling Tower Testing Methodology (TP-163A)
$4.2
CTI TP77-12a
Published Date: 01/01/1977
CTI Water Cooling Tower Thermal Performance - Testing Procedures and Instrumentations
$4.2

Best-Selling Products

STI/SPFA R972
Published Date: 12/01/2010
Recommended Practice for the Addition of Supplemental Anodes to sti-P3 USTs (R972)
$9
STI/SPFA SP001
Published Date: 01/01/2018
Standard for the Inspection of Aboveground Storage Tanks
$58.5
STI/SPFA SP001
Published Date: 09/01/2011
Standard for the Inspection of Aboveground Storage Tanks
$51
STI/SPFA SP001
Published Date: 02/01/2024
Standard for the Inspection of Aboveground Storage Tanks
$58.5