CTI TP02-11 PDF

CTI TP02-11 PDF

Name:
CTI TP02-11 PDF

Published Date:
02/06/2002

Status:
Active

Description:

Collapse of Tuttle No. 2 Cooling Tower and Resulting Replacement/Repair Program

Publisher:
Cooling Technology Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$4.2
Need Help?

File Size : 1 file , 1.3 MB
Number of Pages : 12
Published : 02/06/2002

History


Related products

CTI TP02-08b
Published Date: 02/06/2002
Suitability of Preservative-Treated Radiata Pine for Cooling Tower Construction
$4.2
CTI TP02-08c
Published Date: 02/06/2002
Suitability of Preservative-Treated Radiata Pine for Cooling Tower Construction
$4.2
CTI TP05-11
Published Date: 03/03/2005
Complete Structural Rebuild of two Six Cell Crossflow Cooling Towers using all FRP Members
$4.2
CTI TP08-22
Published Date: 02/07/2008
Construction Productivity Guidelines for Field Erected Cooling Towers
$4.2

Best-Selling Products

CMAA 70-04
Published Date: 01/01/2004
Specifications for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
CMAA 70-2010
Published Date: 2010
Specification for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
CMAA 70-2020
Published Date: 2020
Specification for Top Running Bridge and Gantry Type Multiple Girder Electric Overhead Traveling Cranes
$31.5
CMAA 74-2004
Published Date:
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
CMAA 74-2010
Published Date: 2010
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
CMAA 74-2020
Published Date: 2020
Specification for Top Running and Under Running Single Girder Electric Overhead Cranes Utilizing Under Running Trolley Hoist
$31.5