CTI TP99-14d PDF

CTI TP99-14d PDF

Name:
CTI TP99-14d PDF

Published Date:
02/01/1999

Status:
Active

Description:

Conversion of a Crossflow Tower to a Double-Level, Multi Fan Counter Flow Tower

Publisher:
Cooling Technology Institute

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
cti-tp99-14d_1576462

Choose Document Language:
4.20 €
Need Help?

File Size : 1 file , 3.8 MB
Number of Pages : 3
Published : 02/01/1999

History


Related products

CTI TP97-02
Published Date: 02/01/1997
Com Ed Co. Byron Generating Station Unit 1 Crossflow to Counterflow Conversion
4.20 €
CTI TP99-14
Published Date: 02/01/1999
Conversion of a Crossflow Tower to a Double-Level, Multi Fan Counter Flow Tower
4.20 €
CTI TP99-14a
Published Date: 02/01/1999
Conversion of a Crossflow Tower to a Double-Level, Multi Fan Counter Flow Tower
4.20 €
CTI TP99-14b
Published Date: 02/01/1999
Conversion of a Crossflow Tower to a Double-Level, Multi Fan Counter Flow Tower
4.20 €

Best-Selling Products

BS ISO/TR 10064-1:1992
Published Date: 11/30/2006
Code of inspection practice-Inspection of corresponding flanks of gear teeth
110.49 €
BS ISO/TR 10064-2:1996
Published Date: 12/29/2006
Code of inspection practice-Inspection related to radial composite deviations, runout, tooth thickness and backlash
92.96 €
BS ISO/TR 10064-3:1996
Published Date: 11/30/2006
Code of inspection practice-Recommendations relative to gear blanks, shaft centre distance and parallelism of axes
57.15 €
BS ISO/TR 10064-4:1998
Published Date: 11/30/2006
Code of inspection practice-Recommendations relative to surface texture and tooth contact pattern checking
79.25 €
BS ISO/TR 10193:1989
Published Date: 01/15/1996
Round general use light gauge metal containers. Nominal filling volumes and nominal diameters
57.15 €
BS ISO/TR 10194:1989
Published Date: 01/15/1996
Non-round general use light gauge metal containers. Nominal filling volumes and nominal cross-sections
57.15 €