Project Schedule and Cost Performance Management (PSCPM)

Publisher:
Dansk Standard

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$11.4
Need Help?

The scope of this document covers project schedule and cost performance management which is part of the contract management business domain. Project schedule and cost performance management data exchange occurs once a contract for a project has been approved, funded, and authorization to proceed has been given by a client. This data exchange continues throughout the life of the project until the project naturally concludes or it is cancelled. The project schedule and cost performance management international standard focuses on exchanging the relevant data for the four main purposes listed below. - Establishing the schedule and cost performance management baseline. The baseline is established as quickly as possible after contract award. This baseline provides the basis for measuring work performance over the life of the project. - Providing schedule progress and cost performance data on a periodic basis (such as weekly or monthly) for the purpose of reporting the work progress in schedule and cost terms in comparison to the schedule and cost performance measurement baseline. This periodic schedule and cost information is used to determine if the project is ahead or behind schedule, or if the project is over or under running the cost plan (the budget). It can also be used to identify high risk or problem areas for the project and for planning future work based on project performance to date. Providing a means to incorporate changes to the schedule and cost baseline (contract changes) as well as other changes required to keep the current working schedule and future cost plan up to date. Capturing end of contract schedule and cost data. Historical project performance data can be used as a basis for estimating the schedule and cost of future projects.


Edition : 09
File Size : 1 file , 810 KB
Number of Pages : 10
Product Code(s) : DS-009, DS-009
Published : 11/06/2009

History


Related products

DANSK DS/EN 60216-4-3
Published Date: 12/15/2000
Electrical insulating materials - Thermal endurance properties - Part 4-3: Ageing ovens - Multi-chamber ovens
$18
DANSK DS/EN ISO 10692-1
Published Date: 11/01/2001
Gas cylinders - Gas cylinder valve connections for use in the microelectronics industry - Part 1: Outlet connections
$19.2
DANSK DS/EN ISO 10082
Published Date: 04/05/2000
Plastics - Phenolic resins - Classifications and test methods
$18
DANSK DS/EN 1332-3
Published Date: 07/20/2020
Identification card systems – User Interface – Part 3: Key pads
$18

Best-Selling Products

ISO/R 1938-1:1971
Published Date: 01/01/1971
ISO system of limits and fits - Part 1: Inspection of plain workpieces
$30.6
ISO/R 1938:1971
Published Date: 02/01/1971
ISO system of limits and fits - Part II : Inspection of plain workpieces
$44.7
ISO/R 463:1965
Published Date: 12/01/1965
Dial gauges reading in 0.01 mm, 0.001 in and 0.0001 in
$9.9
ISO/R 538:1967
Published Date: 01/01/1967
Conventional signs to be used in the schemes for the installations of pipeline systems in ships
$36.9
ISO/R 644:1967
Published Date: 12/01/1967
Conventional signs to be used in schemes for the installations of ventilation systems in ships
$36.9
ISO/R 773:1969
Published Date: 01/01/1969
Rectangular or Square Parallel Keys and their Corresponding Keyways (Dimensions in Millimetres)
$19.5