DANSK DS/EN 50341-2-19 PDF

DANSK DS/EN 50341-2-19 PDF

Name:
DANSK DS/EN 50341-2-19 PDF

Published Date:
05/06/2015

Status:
[ Active ]

Description:

Overhead electrical lines exceeding AC 1 kV - Part 2-19: National Normative Aspects (NNA) for CZECH REPUBLIC (based on EN 50341-1:2012)

Publisher:
Dansk Standard

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$33
Need Help?

1.1 General (ncpt) CZ.1 New overhead line The new overhead line is considered a brand new electric overhead line with nominal voltage exceeding 1 kV AC, between the points A and B. The new branch line of the existing overhead line shall be considered a new overhead line except for a junction support for which the specific requirements shall be defined in the Project Specification. The extent of application of this standard in respect of reconstruction, relaying and extension of existing overhead lines shall be determined in the Project Specification. Simultaneously, the Project Specification shall determine, which of the previous national standards shall be used and to what extent they shall be used for the project in question. 1.2 Field of application (ncpt) CZ.1 Field of application The requirements of this standard shall be adopted, where applicable (e.g. requirements on loads, external clearances, etc.), for telecommunication cables as well. In case of overhead line under the design stage, parties concerned shall agree the extent of the application of this standard. Overhead line under construction may be completed according to standards valid during the design stage of the line. The parties concerned shall agree any possible application of certain clauses of this standard. (ncpt) CZ.2 Installation of telecommunication equipment on supports Provisions of this standard also apply to the telecommunication equipment and devices (aerials, dish antennas, etc.) which are installed on individual supports of overhead power lines, especially in terms of wind and ice loads on such installed equipment. Design and installation has to respect requirements of the utility operating the line in question. The design of such telecommunication equipment has to incorporate such technical solutions and such precautions, which shall allow safe access and maintenance of both a power line and telecommunication equipment, and which shall provide protection of persons p ...


Edition : 15
File Size : 1 file , 5.2 MB
Number of Pages : 65
Product Code(s) : DS-061, DS-061
Published : 05/06/2015

History


Related products

DANSK DS/CEN/TS 12101-11
Published Date: 07/26/2022
Smoke and heat control systems – Part 11: Horizontal flow powered ventilation systems for enclosed car parks
$30.3
DANSK DS/EN IEC 62759-1
Published Date: 08/24/2022
Photovoltaic (PV) modules – Transportation testing – Part 1: Transportation and shipping of module package units
$19.2
DANSK DS/EN 10242
Published Date: 11/16/1995
Threaded pipe fitting in malleable cast iron
$42
DANSK DS/EN 1117
Published Date: 12/22/1998
Heat exchangers - Liquid cooled refrigerant condensers - Test procedures for establishing the performance
$11.4

Best-Selling Products