DANSK DS/EN ISO 10427-2 PDF

DANSK DS/EN ISO 10427-2 PDF

Name:
DANSK DS/EN ISO 10427-2 PDF

Published Date:
07/29/2004

Status:
[ Active ]

Description:

Petroleum and natural gas industries - Equipment for well cementing - Part 2: Centralizer placement and stop-collar testing

Publisher:
Dansk Standard

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$19.2
Need Help?
SAME AS ISO 10427-2

This part of ISO 10427 provides calculations for determining centralizer spacing, based on centralizer performance and desired standoff, in deviated and dogleg holes in wells for the petroleum and natural gas industries. It also provides a procedure for testing stop collars and reporting test results.


Edition : 04
File Size : 1 file , 320 KB
Number of Pages : 26
Product Code(s) : DS-026, DS-026
Published : 07/29/2004

History


Related products

DANSK DS/EN ISO 16645
Published Date: 06/17/2019
Radiological protection – Medical electron accelerators – Requirements and recommendations for shielding design and evaluation (ISO 16645:2016)
$35.7
DANSK DS/ISO 15709
Published Date: 09/11/2002
Soil quality - Soil water and the unsaturated zone - Definitions, symbols and theory
$19.8
DANSK DS/EN 62660-3
Published Date: 11/21/2016
Secondary lithium-ion cells for the propulsion of electric road vehicles – Part 3: Safety requirements
$19.2
DANSK DS/EN 14323
Published Date: 11/29/2021
Wood-based panels – Melamine faced boards for interior uses – Test methods
$19.2

Best-Selling Products

NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$0.3
NEBB BET PUBLICATION
Published Date: 08/01/2019
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$62.1
NEBB BET PUBLICATION
Published Date: 03/01/2015
PROCEDURAL STANDARD FOR BUILDING ENCLOSURE TESTING
$123.9
NEBB BUILDING SYSTEMS
Published Date:
Procedural Standards for Whole Building Systems Commissioning of New Construction
NEBB BUILDING SYSTEMS
Published Date: 01/01/2019
PROCEDURAL STANDARDS FOR WHOLE BUILDING SYSTEMS COMMISSIONING OF NEW CONSTRUCTION
$62.1