DANSK DS/IEC TR 61375-2-7 PDF

DANSK DS/IEC TR 61375-2-7 PDF

Name:
DANSK DS/IEC TR 61375-2-7 PDF

Published Date:
06/18/2014

Status:
[ Active ]

Description:

Electronic railway equipment - Train communication network (TCN) - Part 2-7: Wireless Train Backbone (WLTB)

Publisher:
Dansk Standard

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$24.9
Need Help?
SAME AS IEC 60839-2-7

This part of IEC 61375 describes the protocols stack of a radio based Wireless Train Backbone which is used in distributed power freight trains. This part provides information on the physical layer, the data link layer, the application layer and distributed power application. The automatic inauguration of the radio based Wireless Train Backbone is not considered in this technical report.


Edition : 14
File Size : 1 file , 1.7 MB
Number of Pages : 34
Product Code(s) : DS-031, DS-031
Published : 06/18/2014

History


Related products

DANSK DS/ISO 12604-1
Published Date: 03/27/2017
Aircraft ground handling – Checked baggage – Part 1: Mass and dimensions
$14.7
DANSK DS/EN ISO 17279-2
Published Date: 11/26/2018
Welding – Micro joining of 2nd generation high temperature superconductors – Part 2: Qualification for welding and testing personnel (ISO 17279-2:2018)
$22.5
DANSK DS/ISO 5058-1
Published Date: 11/16/2021
Biotechnology – Genome editing – Part 1: Vocabulary
$25.8
DANSK DS/CLC/TS 61496-3
Published Date: 07/04/2008
Safety of machinery – Electro-sensitive protective equipment – Part 3: Particular requirements for Active Opto-electronic Protective Devices responsive to Diffuse Reflection (AOPDDR)
$33

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138