DANSK DSF/ISO/DTR 27925 PDF

DANSK DSF/ISO/DTR 27925 PDF

Name:
DANSK DSF/ISO/DTR 27925 PDF

Published Date:

Status:
[ Draft ]

Description:

Carbon dioxide capture, transportation and geological storage – Cross cutting issues – Flow assurance

Publisher:
Dansk Standard

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$23.1
Need Help?
DRAFT

This document describes and explains the physical and chemical phenomena, and the technical issues associated with flow assurance in the various components of a carbon dioxide capture and storage (CCS) system and provides information on how to achieve and manage flow assurance. The gaps in technical knowledge, limitations of the tools available and preventative and corrective measures that can be taken are also described. This document addresses flow assurance of CO2 streams in a CCS project, from CO2 capture via transport by pipeline and injection well through to geological storage. It does not specifically address upstream issues associated with CO2 sources and capture, although flow assurance will inform CO2 capture design and operation, for example on constraints on the presence of impurities in CO2 streams, as there are too many different capture technologies to be treated in detail in this document. Vessel transport and buffer storage that are considered in integrated CCS projects under development, are not covered in this document. Flow of material in the supply chain of a CO2 source, even if delivered by a pipeline (e.g. blue hydrogen generation), and flow of gas streams within facilities generating and feeding these into a capture facility can impact flow assurance in CCS projects and networks. These are out of the scope of this document as well. This document also examines the impact of impurities on the phase behaviour and physical properties of the CO2 stream which in turn can ultimately affect the continuous supply of the CO2 stream from the capture plant, through the transportation system and into the geological reservoir via injection wells. Flow of fluids in oil reservoirs for the purpose of enhanced oil recovery is not within the scope of this document.


Edition : 23#
File Size : 1 file , 2.8 MB
Number of Pages : 63
Product Code(s) : DSF-061, DSF-061

History


Related products

DANSK DS/EN ISO 6744-1
Published Date: 07/07/2004
Binders for paints and varnishes - Alkyd resins - Part 1: General methods of test
$13.2
DANSK DS/IEC 62807-3 ED1
Published Date: 02/14/2023
Hybrid telecommunication cables – Part 3: Outdoor hybrid cables – Sectional specification
$16.8
DANSK DS/EN 16019
Published Date: 04/11/2014
Railway applications – Automatic coupler – Performance requirements, specific interface geometry and test method
$22.5
DANSK DS/EN 62494-1
Published Date: 03/31/2009
Medical electrical equipment - Exposure index of digital X-ray imaging systems - Part 1: Definitions and requirements for general radiography
$19.2

Best-Selling Products

PFI ES11
Published Date: 01/01/1996
Permanent Marking on Piping Materials
PFI ES16
Published Date: 01/01/1985
Access Holes, Bosses and Plugs for Radiographic Inspection of Pipe Welds
PFI ES1
Published Date: 07/01/1995
Internal Machining & Solid Machined Backing Rings for Circumferential Butt Welds
PFI ES20
Published Date: 01/01/1997
Wall Thickness Measurement by Ultrasonic Examination
PFI ES21
Published Date: 01/01/1992
Internal Machining & Fit-Up of GTAW Root Pass Circumferential Butt Welds
PFI ES22
Published Date: 01/01/1995
Recommended Practice for Color Coding of Piping Materials