DANSK DSF/PREN ISO 3421 PDF

DANSK DSF/PREN ISO 3421 PDF

Name:
DANSK DSF/PREN ISO 3421 PDF

Published Date:

Status:
[ Draft-Obsolete ]

Description:

Petroleum and natural gas industries – Drilling and production equipment – Offshore conductor design, setting depth, and installation (ISO/DIS 3421:2021)

Publisher:
Dansk Standard

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$14.7
Need Help?
DRAFT * W/D S/S BY DS/EN ISO 3421

This document gives requirements for the design, setting depth and installation of conductors used by the offshore petroleum and natural gas industries. This document covers: - design of the conductor, i.e. determination of the diameter, wall thickness, and steel grade; - determination of the setting depth for three installation methods, namely, driving, drilling/cementing, and jetting; - installation requirements for the installation methods, i.e. selection principles, operating procedures and parameters. This document is applicable to: - Platform conductors: installed through a guide hole in the platform drill floor and then through guides attached to the jacket at appropriate intervals through the water column to support the conductor withstand metocean actions and prevent excessive displacements. - Jack-up supported conductors: a temporary conductor used only during drilling operations, which is installed by a jack-up drilling rig. In some cases, the conductor is tensioned by tensioners attached to the drilling rig. - Free-standing conductors: a self-supporting caisson in cantilever mode installed in shallow water, typically depths of about 10 m to 20 m. It provides sole support for the well and sometimes supports a small access deck and boat landing. - Subsea wellhead conductors: a fully submerged conductor extending only a few metres above the seafloor. This document does not apply to drilling risers.


Edition : 21
File Size : 1 file , 2.2 MB
Number of Pages : 45
Product Code(s) : DSF-036, DSF-036

History

DANSK DSF/FPREN ISO 3421
Published Date:
Petroleum and natural gas industries – Drilling and production equipment – Offshore conductor design, setting depth and installation (ISO/FDIS 3421:2022)
$14.7
DANSK DSF/PREN ISO 3421
Published Date:
Petroleum and natural gas industries – Drilling and production equipment – Offshore conductor design, setting depth, and installation (ISO/DIS 3421:2021)
$14.7
DANSK DS/EN ISO 3421
Published Date: 06/21/2022
Petroleum and natural gas industries – Drilling and production equipment – Offshore conductor design, setting depth and installation (ISO 3421:2022)
$27

Related products

DANSK DSF/FPREN 12574-3
Published Date:
Stationary waste containers – Part 3: Safety and health requirements
$8.7
DANSK DS/EN 6059-601
Published Date: 07/07/2014
Aerospace series - Electrical cables, installation - Protection sleeves - Test methods - Part 601: Open and close
$11.4
DANSK DS/CLC/TS 50467
Published Date: 06/10/2008
Railway applications - Rolling stock - Electrical connectors, requirements and test methods
$30
DANSK DS/EN IEC 60335-2-51
Published Date: 12/07/2023
Household and similar electrical appliances – Safety – Part 2-51: Particular requirements for stationary circulation pumps for heating and service water installations
$15.3

Best-Selling Products

JSSG JSSG-2000B Notice 1 - Validation
Published Date: 08/21/2009
Air System
$3.6
JSSG JSSG-2000B Notice 2 - Validation
Published Date: 08/06/2014
Air System
$3.6
JSSG JSSG-2001A
Published Date: 10/22/2002
Air Vehicle
$35.7
JSSG JSSG-2001B Notice 1 - Validation 1
Published Date: 01/29/2009
Air Vehicle
$3.6
JSSG JSSG-2001B Notice 2 - Validation 2
Published Date: 12/03/2013
Air Vehicle
$3.6
JSSG JSSG-2001B Notice 3 - Validation 3
Published Date: 09/12/2018
Air Vehicle
$3.6