DIN 86037-3 PDF

DIN 86037-3 PDF

Name:
DIN 86037-3 PDF

Published Date:
10/01/1995

Status:
[ Withdrawn ]

Description:

Loose flanges and welding necks for pipes of copper-nickel-alloys - Part 3: Loose flanges

Publisher:
Deutsches Institut Fur Normung E.V. (German National Standard)

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$11.118
Need Help?

File Size : 1 file , 160 KB
Note : This product is unavailable in Ukraine, Russia, Belarus
Number of Pages : 4
Product Code(s) : 2786030, 2786030
Published : 10/01/1995

History

DIN 86037-3
Published Date: 12/01/2017
Loose flanges and welding necks for pipes of copper-nickel-alloys - Part 3: Loose flanges
$13.407
DIN 86037-3
Published Date: 10/01/1995
Loose flanges and welding necks for pipes of copper-nickel-alloys - Part 3: Loose flanges
$11.118

Related products

DIN EN 12819
Published Date: 06/01/2019
LPG equipment and accessories - Inspection and requalification of LPG pressure vessels greater than 13 m<(hoch)3>
$41.856
DIN EN ISO 9080
Published Date: 02/01/2013
Plastics piping and ducting systems - Determination of the long-term hydrostatic strength of thermoplastics materials in pipe form by extrapolation (ISO 9080:2012); German and English version EN ISO 9080:2012
$40.875
DIN EN 16821
Published Date: 10/01/2017
Rubber and plastics hoses and hose assemblies for use in the pharmaceutical and biotechnological industry - Silicone rubber hoses
$30.738
DIN 4262-3
Published Date: 10/01/2010
Pipes and fittings for subsoil drainage of trafficked areas and underground engineering - Part 3: Pipes and fittings made from concrete and their joints
$24.525

Best-Selling Products

NG AMBP 051
Published Date: 09/01/2010
Asset Management Business Procedure - The Implementation of Construction (Design & Management) Regulations (CDM) 2007. Delivery of Asset Management Maintenance Delivery Electricity Minor Schemes
$138
NG AMBP 051
Published Date: 08/01/2015
Asset Management Business Procedure - Implementation of Construction (Design & Management) Regulations (CDM) 2015. Delivery of ETAM Operation Projects and Temporary Works Coordination for Construction
$138
NG AMBP 130
Published Date: 06/01/2018
Asset Management Business Procedure - Management of OHL Work in ETO Operations
$138
NG AMBP 130
Published Date: 02/01/2011
Asset Management Business Procedure - Guidance for Planning of Work on or Near to High Voltage Overhead Lines
$138
NG AMBP 136
Published Date: 10/01/2013
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
NG AMBP 136
Published Date: 01/01/2015
Asset Management Business Procedure - Working at Height Standards – Overhead Lines
$138