DIN CWA 13849-3 PDF

DIN CWA 13849-3 PDF

Name:
DIN CWA 13849-3 PDF

Published Date:
06/01/2000

Status:
Active

Description:

ActiveXFS interface specification - Part 3: ActiveXFS cash dispenser object interface specification; English version CWA 13849-3:2000

Publisher:
DIN-adopted CEN Workshop Agreement

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$20.274
Need Help?

File Size : 1 file , 2.5 MB
Number of Pages : 72
Product Code(s) : 9027776, 9027776
Published : 06/01/2000

History


Related products

DIN CWA 13449-3
Published Date: 03/01/1999
Extensions for Financial Services (XFS) interface specification - Part 3: Printer Device Class Interface; programmer's reference; English version CWA 13449-3:1998
$13.407
DIN ETS 300214
Published Date: 07/01/1993
Network Aspects (NA); Metropolitan Area Network (MAN); physical layer convergence procedure for 34.368 Mbit/s; English version ETS 300214:1992
$13.407
DIN CEN/TS 14821-2
Published Date: 06/01/2005
Traffic and Travel Information (TTI) - TTI messages via cellular networks - Part 2: Numbering and ADP message header; English version CEN/TS 14821-2:2003
$28.122

Best-Selling Products

PTI C30.1
Published Date: 01/01/2003
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 1 - FIELD FUNDAMENTALS
$21.9
PTI C30.1S
Published Date: 01/01/2006
ENTRENAMIENTO Y CERTIFICACIÓN DE PERSONAL DE CAMPO PARA POSTENSADO SIN TENDONES ADHERENTES
$21.9
PTI C30.2
Published Date: 01/01/2002
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 2 - IRONWORKER
PTI C30.3
Published Date: 01/01/2006
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR UNBONDED POST-TENSIONING LEVEL 2 - POST-TENSIONING INSPECTOR
$29.4
PTI C30.4 ERTA
Published Date: 01/14/2022
Training and Certification of Field Personnel for Multistrand & Grouted Post‐Tensioning Student Manual
$0.3
PTI C30.4
Published Date: 02/01/2007
TRAINING AND CERTIFICATION OF FIELD PERSONNEL FOR BONDED POST-TENSIONING