DIN EN 61108-3 PDF

DIN EN 61108-3 PDF

Name:
DIN EN 61108-3 PDF

Published Date:
02/01/2011

Status:
Active

Description:

Maritime navigation and radiocommunication equipment and systems - Global navigation satellite systems (GNSS) - Part 3: Galileo receiver equipment - Performance requirements, methods of testing and required test results (IEC 61108-3:2010); English version EN 61108-3:2010

Publisher:
DIN-adopted European Standard

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
din-en-61108-3_1783035

Choose Document Language:
53.30 €
Need Help?

File Size : 1 file
Note : This product is unavailable in Russia, Ukraine, Belarus
Number of Pages : 61
Product Code(s) : 1737686, 1737686
Published : 02/01/2011

History


Related products

DIN 22118
Published Date: 08/01/1991
Conveyor belts with textile plies for use in coal mining; fire testing
13.41 €
DIN 84155
Published Date: 12/01/1995
Shipbuilding - Cable stoppers
11.12 €
DIN 85005-6
Published Date: 08/01/1998
Ships and marine technology - Graphical symbols for technical documentation - Part 6: Freshwater distilling unit
11.12 €
DIN 83221
Published Date: 07/01/2006
Walkways in ship's engine rooms and boiler rooms
24.53 €

Best-Selling Products

NS-ISO/IEC/IEEE 12207:2017
Published Date: 10/01/2018
Systems and software engineering — Software life cycle processes
NS-ISO/IEC/IEEE 15026-4:2021
Published Date: 06/22/2021
Systems and software engineering - Systems and software assurance - Part 4: Assurance in the life cycle
NS-ISO/IEC/IEEE 15288:2015
Published Date: 11/01/2018
Systems and software engineering — System life cycle processes
NS-ISO/IEC/IEEE 15288:2023
Published Date: 05/30/2023
Systems and software engineering — System life cycle processes
NS-ISO/IEC/IEEE 16085:2021
Published Date: 02/05/2021
Systems and software engineering — Life cycle processes — Risk management
NS-ISO/IEC/IEEE 16326:2009
Published Date: 11/01/2018
Systems and software engineering - Life cycle processes - Project management