DNV DNV-CP-0507 PDF

DNV DNV-CP-0507 PDF

Name:
DNV DNV-CP-0507 PDF

Published Date:
09/01/2021

Status:
[ Active ]

Description:

System and software engineering

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.1
Need Help?

This CP specifies requirements to specific content of the manufacturer's quality system including documentation to be produced for evidence of its application.

Although this CP intends to cover the life cycle of a software based system or component, the requirements are related only to the activities performed by the manufacturer. Activities to be performed by other stakeholders, such as system integrator and owner, are not part of this CP.

The AoM certification process is described in Sec.2 and requirements to the quality system are described in Sec.3.


Edition : 21
File Size : 1 file , 650 KB
Number of Pages : 41
Published : 09/01/2021

History

DNV DNV-CP-0507
Published Date: 09/01/2021
System and software engineering
$17.1
DNV DNVGL-CP-0507
Published Date: 07/01/2018
System and software engineering
$17.1

Related products

DNV DNV-RP-A203
Published Date: 09/01/2019
Technology qualification
$43.5
DNV DNV-CP-0110
Published Date: 12/01/2022
Anti-fouling systems
$17.1
DNV DNV-ST-0358
Published Date: 09/01/2017
Offshore gangways
$17.1
DNV DNV-RU-SHIPS PART 4 CHAPTER 6
Published Date: 07/01/2016
NEWBUILDINGS MACHINERY AND SYSTEMS - MAIN CLASS - Piping systems
$17.1

Best-Selling Products

NORSOK C-001:2022
Published Date: 03/21/2022
Living quarters area
NORSOK C-004:2019+AC:2022
Published Date: 10/23/2019
Helicopter deck on offshore installations
NORSOK D-002
Published Date: 01/13/2020
Well intervention equipment
NORSOK D-007
Published Date: 03/26/2021
Well testing, clean-up and flowback systems
NORSOK D-010:2021+AC2:2021
Published Date: 12/23/2021
Well integrity in drilling and well operations
NORSOK D-010/AC:2021
Published Date: 06/23/2021
CORRIGENDUM: Well integrity in drilling and well operations