DNV DNV-DSS-315 PDF

DNV DNV-DSS-315 PDF

Name:
DNV DNV-DSS-315 PDF

Published Date:
10/01/2010

Status:
[ Revised ]

Description:

VERIFICATION OF ONSHORE LNG AND GAS FACILITIES

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.1
Need Help?

Scope of application for verification

This specification may be adopted for the verification of parts of onshore liquefied natural gas and gas receiving facilities during the project development phase starting from detailed design up to and including commissioning and start-up.

The LNG and gas facilities covered in this specification comprise the following critical systems:

— support structures and foundations

— non-cryogenic critical vessels, piping and equipment

— cryogenic critical vessels, piping and equipment (including transfer piping)

— LNG storage tanks

— open hazardous drains

— pressure relief systems

— ignition prevention and control systems

— emergency shutdown system

— blowdown system

— fire and gas detection system

— fire and blast protection

— emergency power supply

— escape and evacuation means

— emergency communication systems

— environmental control.

which are applied in various configurations and tailored to each particular project's specific requirements. The specification does not cover the following:

— Jetty, Mooring and Marine related facilities (with the exception of the shore based transfer systems and associated safety equipment. Jetty structures are covered by DNV-OSS-304).

— the import and export pipelines within plant battery limits (this is covered under DNV-OSS-301)

Compliance to CE Marking Directives such as Pressure Equipment Directive (PED/97/23/EC), Machinery Equipment Directive 98/37/EC and Explosion Proof Devices ATEX 94/9/EC which are applicable in the European Community are not covered in this specification.

This DSS describes the principle of a levelled verification involvement, where the extent of verification involvement is linked to the risks associated with part or all of the facility.

The primary scope of DNV's verification work is the verification of the integrity of gas facilities and the safety of its personnel and those in close proximity to it. Other aspects, such as the verification of the environmental safety of the facility, or its ability to meet the Client's business objectives, may be included in DNV's scope of work if desired by the Client.

Statutory verification (or certification) of onshore gas facilities to the requirements of National Authorities is not included specifically in the scope of application of this DSS. Such verification (or certification) shall be governed by the regulations of the relevant Authority. However, if detailed procedures are not given by these Authorities, this DSS shall be used by DNV as a guideline for its work.


Edition : 10
File Size : 1 file , 570 KB
Number of Pages : 75
Published : 10/01/2010

History

DNV DNV-DSS-315
Published Date: 10/01/2010
Verification of Onshore LNG and Gas Facilities
$17.1
DNV DNV-DSS-315
Published Date: 10/01/2010
VERIFICATION OF ONSHORE LNG AND GAS FACILITIES
$17.1

Related products

DNV DNV-OS-D301
Published Date: 07/01/2019
Fire protection
$17.1
DNV DNV-RU-SHIPS PART 4 CHAPTER 6
Published Date: 07/01/2016
NEWBUILDINGS MACHINERY AND SYSTEMS - MAIN CLASS - Piping systems
$17.1
DNV DNV-RU-SHIPS/HSLC PART 6 CHAPTER 13
Published Date: 01/01/2016
NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS – ADDITIONAL CLASS Gas fuelled ship installations
DNV DNV-RU-SHIPS PART 5 CHAPTER 4
Published Date: 07/01/2016
NEWBUILDINGS SPECIAL SERVICE AND TYPE - ADDITIONAL CLASS - Chemical Carriers
$17.1

Best-Selling Products