DNV DNV-RP-0171 PDF

DNV DNV-RP-0171 PDF

Name:
DNV DNV-RP-0171 PDF

Published Date:
02/01/2018

Status:
[ Active ]

Description:

Testing of rotor blade erosion protection systems

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$43.5
Need Help?

The rain erosion performance of the test specimens is dependent on many parameters which are not directly connected to the erosion protection system itself such as, the substrate below the protection system (laminate and filler) and the test rig parameters. This recommended practice provides guidance as to which parameters will influence the test results, and therefore shall be monitored and controlled during erosion testing, to ensure comparable results when using different test rigs. As far as applicable, the parameters are set to represent the environmental conditions that a leading edge of a rotor blade on a wind turbine is exposed to.

In addition, guidance is provided for the selection of a calibration specimen.

The results from a round robin test on calibration specimens and on three coated specimens are anonymised and provided in App.C. The designs of all three test rigs used for these tests were very similar.

An evaluation of the erosion test results with regards to the erosion performance, lifetime, outliers or the required number of specimens, is not within the scope of this RP.

This RP was developed as an extension to the requirements specified in the ASTM G73-10 standard.


Edition : 18
File Size : 1 file , 2.1 MB
Number of Pages : 64
Published : 02/01/2018

History

DNV DNV-RP-0171
Published Date: 02/01/2018
Testing of rotor blade erosion protection systems
$43.5
DNV DNVGL-RP-0171
Published Date: 02/01/2018
Testing of rotor blade erosion protection systems
$43.5

Related products

DNV DNV TAP NO. 849.80-MED A.1/4.29
Published Date: 04/01/2009
SHIPBORNE VOYAGE DATA RECORDER (VDR)
$17.1
DNV DNV-RU-SHIPS PART 6 CHAPTER 18
Published Date: 07/01/2016
NEWBUILDINGS SPECIAL EQUIPMENT AND SYSTEMS - ADDITIONAL CLASS - Ballast Water Management
$17.1
DNV DNV-RU-HSLC PART 6 CHAPTER 3
Published Date: 07/01/2011
SPECIAL EQUIPMENT AND SYSTEMS ADDITIONAL CLASS - Periodically Unattended Machinery Space
$17.1
DNV DNV-RU-SHIPS PART 6 CHAPTER 37
Published Date: 07/01/2016
NEW BUILDINGS SPECIAL EQUIPMENT AND SYSTEMS – ADDITIONAL CLASS Gas bunker vessels
$17.1

Best-Selling Products

UOP 1-87
Published Date: 01/01/1987
Distillation Range of Heavy Petroleum Oils and Determination of Coke Residue
$86.1
UOP 1000-12
Published Date: 11/01/2012
Smoke Point Determination of Kerosene and Aviation Turbine Fuel Using an Automated Method
$86.1
UOP 1000-13
Published Date: 03/01/2013
Smoke Point Determination of Kerosene and Aviation Turbine Fuel Using an Automated Method
$72
UOP 1001-14
Published Date: 08/21/2014
Chloride and Fluoride in Liquefied Petroleum Gases (LPG) by Combustion Ion Chromatography (CIC)
$72
UOP 1003-13
Published Date: 09/01/2013
Trace Metals in Methanol by ICP-OES
$72
UOP 1005-14
Published Date: 03/01/2014
Trace Metals in Organics by ICP-MS
$72