DNV DNV-RP-E101 PDF

DNV DNV-RP-E101 PDF

Name:
DNV DNV-RP-E101 PDF

Published Date:
10/01/2008

Status:
[ Revised ]

Description:

RECERTIFICATION OF WELL CONTROL EQUIPMENT

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$43.5
Need Help?

Introduction

The purpose of this document is to describe DNV's recommendations for recertification of well control equipment. It is DNV's recommendation that a major overhaul/inspection of Blow Out Preventers and other well pressure control equipment used for Drilling, Completion, Workover and Well intervention operations, should be performed at least every five years. The purpose of this inspection is to verify and document that the equipment condition and properties are within the specified acceptance criteria as well as the specified recognized codes and standards, thus ensuring that documentation of the condition of the equipment is available at all times. However, national petroleum safety authorities' regulations can differently regulate the interval and overhaul/inspection scope.

The recertification scheme should be used as a recommended methodology for other types of equipment which is subject to a complete overhaul, repair or modification.

The recertification scheme may be used to describe the document-, and verification requirements for design and fabrication of new well control equipment as well.


Edition : 08
File Size : 1 file , 230 KB
Number of Pages : 14
Published : 10/01/2008

History

DNV DNV-RP-E101
Published Date: 09/01/2019
Recertification of well control equipment
$43.5
DNV DNVGL-RP-E101
Published Date: 09/01/2019
Recertification of well control equipment
$43.5
DNV DNVGL-RP-E101
Published Date: 02/01/2017
Recertification of well control equipment
DNV DNV-RP-E101
Published Date: 01/01/2012
Recertification of Well Control Equipment for the Norwegian Continental Shelf
$43.5
DNV DNV-RP-E101
Published Date: 10/01/2008
RECERTIFICATION OF WELL CONTROL EQUIPMENT
$43.5

Related products

DNV DNV-RU-UWT PART 3 CHAPTER 7
Published Date: 07/01/2021
Part 3 Pressure hull and structures - Chapter 7 Stability and buoyancy
$17.1
DNV DNV-RU-SHIPS PART 3 CHAPTER 3
Published Date: 01/01/2016
NEW BUILDINGS HULL AND EQUIPMENT – MAIN CLASS Hull equipment and safety
$17.1
DNV DNV-RU-OU-0102
Published Date: 07/01/2024
Floating production, storage and loading units
$17.1
DNV DNV-RU-UWT PART 5 CHAPTER 5
Published Date: 07/01/2021
Part 5 Types of UWT systems - Chapter 5 Self-contained diver pressure chamber systems
$17.1

Best-Selling Products