DNV DNV-RP-E102 PDF

DNV DNV-RP-E102 PDF

Name:
DNV DNV-RP-E102 PDF

Published Date:
06/01/2010

Status:
[ Obsolete ]

Description:

RECERTIFICATION OF BLOWOUT PREVENTERS AND WELL CONTROL EQUIPMENT FOR THE US OUTER CONTINENTAL SHELF

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Russian version):
200 business days

SKU:

Choose Document Language:
$17.1
Need Help?

Introduction

The purpose of this document is to describe DNV's recommendations for recertification of BOP and well control equipment used in drilling operations on the US Outer Continental Shelf.

It is DNV's recommendation that a recertification of blowout preventers and well control equipment used for drilling, completion, workover and well intervention operations, should be performed at least every five years. The purpose of this recertification is to verify and document that the equipment condition and properties are within the specified updated acceptance criteria as well as recognized codes and standards, thus ensuring that documentation of the condition of the equipment is available at all times.


Edition : 10
File Size : 1 file , 230 KB
Number of Pages : 14
Published : 06/01/2010

History


Related products

DNV DNV-RU-UWT PART 1 CHAPTER 1
Published Date: 07/01/2024
Part 1 General regulations - Chapter 1 General regulations
$17.1
DNV DNV-RP-F108
Published Date: 09/01/2019
Assessment of flaws in pipeline and riser girth welds
$43.5
DNV DNV-RU-SHIPS PART 6 CHAPTER 3
Published Date: 07/01/2024
Part 6 Additional class notations - Chapter 3 Navigation, manoeuvring and position keeping
$17.1
DNV DNV-RU-NAVAL PART 5 CHAPTER 1
Published Date: 07/01/2024
Part 5 Ship types - Chapter 1 Naval
$17.1

Best-Selling Products