DNV DNV-RU-FD PDF

DNV DNV-RU-FD PDF

Name:
DNV DNV-RU-FD PDF

Published Date:
07/01/2022

Status:
[ Revised ]

Description:

Floating docks

Publisher:
DNV

Document status:
Active

Format:
Electronic (PDF)

Delivery time:
10 minutes

Delivery time (for Czech version):
200 business days

SKU:
dnv-dnv-ru-fd_2837936

Choose Document Language:
17.10 €
Need Help?

The following structures, components, systems and properties essential to the operation of the floating dock are covered by the classification and are subject to approval:

— Hull structures and deckhouses, see Ch.2 Sec.1.

— Anchoring equipment, see Ch.2.

— Stability and freeboard, see Ch.3 Sec.1.

— Machinery, see Ch.4.

— Arrangements for fire protection, detection and extinction for the dock and facilities for supplying water from the dock pumps to the extinguishing system of the docked ships, see Ch.5 Sec.1.

The evaluation of possibilities for vibrations in the dock's hull structures is not covered by these rules and the classification, but the Society may advise on this matter upon request.


Edition : 22
File Size : 1 file , 1.2 MB
Number of Pages : 53
Published : 07/01/2022

History

DNV DNV-RU-FD
Published Date: 07/01/2024
Floating docks
17.10 €
DNV DNV-RU-FD
Published Date: 07/01/2022
Floating docks
17.10 €
DNV DNV-RU-FD
Published Date: 07/01/2021
Floating docks
17.10 €
DNV DNVGL-RU-FD
Published Date: 10/01/2015
Floating docks
17.10 €

Related products

DNV DNV-RU-SHIPS PART 7 CHAPTER 8
Published Date: 01/01/2003
SHIPS IN OPERATION - MACHINERY SURVEY ARRANGEMENTS
17.10 €
DNV DNV CLASSIFICATION NOTES 41.3
Published Date: 01/01/2002
CALCULATION OF CRANKSHAFTS FOR DIESEL ENGINES
17.10 €
DNV DNV-RU-SHIPS PART 3 CHAPTER 2
Published Date: 07/01/2022
Part 3 Hull - Chapter 2 General arrangement design
17.10 €
DNV DNV APPROVAL OF MANUFACTURERS NO. 322
Published Date: 07/01/2013
Manufacturers of Offshore Fibre Yarns
17.10 €

Best-Selling Products